Skip to content
DataCentersExposed
ultimate parent

Microsoft Corporation

DataCentersExposed tracks 75 data centers operated by Microsoft Corporation across 16 states, of which 23 are proposed or under construction, with 8.6 GW of reported power capacity.

Sources: SEC EDGAR, GLEIF LEI

Reporting by

Facilities
75
tracked
States
16
footprint
Pipeline
23
proposed / building
Reported power
8.6 GW
People of record

Named in Microsoft Corporation's filings

Individuals named in public corporate registrations for Microsoft Corporation's data-center entities. Each links to the documents that name them — nothing beyond the role stated in the record.

75 facilities

Where Microsoft Corporation builds

FacilityLocationStatusMW
Microsoft Sioux Falls (proposed)Sioux Falls, SDProposed720
Clarksville Data Center CampusClarksville, VAProposed—
Granger Data Center ExpansionGranger, INProposed—
Hillcrest Data CenterSouth Hill, VAProposed—
Kenosha Microsoft Data CenterKenosha, WIProposed—
LYH03 Bailey – MicrosoftChase City, VAProposed—
Microsoft Caledonia Data CenterCaledonia, MIProposed—
Microsoft Castroville Data Center (SAT 89-90)Castroville, TXProposed—
Microsoft Dorr Data CenterDorr, MIProposed—
Microsoft Grand Rapids Data CenterGrand Rapids, MIProposed—
Microsoft LaPorte Data CenterLaPorte, INProposed—
Microsoft Lowell Township Data CenterLowell, MIProposed—
Newton Data CenterNewton, NCProposed—
Person County Mega SiteRoxboro, NCProposed—
Project Firecracker (Microsoft)Rome, GAProposed—
Project Pinenear Pringle, NCProposed—
Microsoft East Point — Douglas CountyGAUnder construction750
Microsoft Mount Pleasant (Fairwater Wisconsin)MOUNT PLEASANT, WIUnder construction450
Microsoft Boydton — Region 2Boydton, VAUnder construction380
Microsoft Union City Data Center CampusCollege Park, GAUnder construction324
Project AgateConover, NCUnder construction—
Project YogaMaiden, NCUnder construction—
Microsoft Licking County Campus 1OHPermitted900
Open AI/ SoftBank Stargate Data Center (Lancium Clean Campus)Abilene, TXOperating1,200
Microsoft Fairwater AtlantaFAYETTEVILLE, GAOperating859
Microsoft QuincyQuincy, WAMapped (unverified)600
Microsoft Boydton — Region 1Boydton, VAMapped (unverified)540
Microsoft San Antonio (Quarry)San Antonio, TXMapped (unverified)380
Microsoft West Des MoinesWest Des Moines, IAMapped (unverified)360
Microsoft West JordanWest Jordan, UTMapped (unverified)220
MicrosoftIAMapped (unverified)200
MicrosoftGoodyear, AZMapped (unverified)176
Microsoft Goodyear CampusGoodyear, AZOperating143
Microsoft—Mapped (unverified)106
MicrosoftIAOperating106
MicrosoftWest Des Moines, IAMapped (unverified)100
MicrosoftSanta Clara, CAMapped (unverified)48
East Point CampusEast Point, GAOperating38
Palmetto CampusPalmetto, GAOperating38
Ams12—Mapped (unverified)—
Cph01—Mapped (unverified)—
Cph07—Mapped (unverified)—
Caledonia Data CenterRacine/ Caledonia, WIBlocked—
MicrosoftIAMapped (unverified)—
Microsoft—Mapped (unverified)—
MicrosoftSan Antonio, TXMapped (unverified)—
Microsoft—Mapped (unverified)—
MicrosoftLeesburg, VAOperating—
Microsoft—Mapped (unverified)—
Microsoft—Mapped (unverified)—
MicrosoftWAMapped (unverified)—
MicrosoftSchwechatMapped (unverified)—
Microsoft—Mapped (unverified)—
MicrosoftTXMapped (unverified)—
Microsoft—Mapped (unverified)—
Microsoft - Azure DatacenterNorthlake, ILMapped (unverified)—
Microsoft Boydton Data CenterVAMapped (unverified)—
Microsoft CYS DatacenterWYMapped (unverified)—
Microsoft DUB10—Mapped (unverified)—
Microsoft Data Center—Mapped (unverified)—
Microsoft Data Center 2VAMapped (unverified)—
Microsoft Datacenter—Mapped (unverified)—
Microsoft EAT03East Wenatchee, WAMapped (unverified)—
Microsoft EAT04WAMapped (unverified)—
Microsoft IAD11VAOperating—
Microsoft IrelandBelfastMapped (unverified)—
Microsoft MAD01—Mapped (unverified)—
Microsoft MEL05—Mapped (unverified)—
Microsoft MEL07—Mapped (unverified)—
Microsoft MEL11—Mapped (unverified)—
Microsoft Newport data centreNewportMapped (unverified)—
Microsoft SYD06 Data Centre—Mapped (unverified)—
Microsoft San AntonioSan Antonio, TXMapped (unverified)—
Microsoft TRP3 (SAT46)TXMapped (unverified)—
Phx-11Goodyear, AZMapped (unverified)—
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$52M
2022–2026
Filings
75
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
MICROSOFT CORPORATION
TaxesEnvironment
$2.4Mfiling
2026
VENTURE GOVERNMENT STRATEGIES, LLC (FKA HOBART HALLAWAY & QUAYLE VENTURES, LLC)
Budget / approps
$60Kfiling
2026
STEWART STRATEGIES AND SOLUTIONS, LLC
Telecom
$60Kfiling
2026
LOT SIXTEEN LLC
Energy / nuclear
$50Kfiling
2026
HOLLIER & ASSOCIATES
Taxes
$30Kfiling
2026
TRACTION STRATEGIC
Science / tech
$23Kfiling
2025
MICROSOFT CORPORATION
TaxesEnvironment
$2.6Mfiling
2025
MICROSOFT CORPORATION
TaxesEnvironment
$2.4Mfiling
2025
MICROSOFT CORPORATION
TaxesEnvironment
$2.4Mfiling
2025
MICROSOFT CORPORATION
TaxesEnvironment
$2.0Mfiling
2025
LOT SIXTEEN LLC
Energy / nuclear
$50Kfiling
2025
LOT SIXTEEN LLC
Energy / nuclear
$50Kfiling

Amounts are each filing's total reported lobbying by Microsoft Corporation (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.