Microsoft West Des Moines

West Des Moines, Polk County, IA

Microsoft West Des Moines is a mapped data center in Polk County, IA, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented 360 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Microsoft Corporation
Operator
Microsoft Data Center LLC
Power
360 MW
Utility
Midamerican Energy Co
Grid
MISO
Attribution & capacity confidence:mediumprovenance JSON

Overview

Microsoft West Des Moines is a hyperscale data center in West Des Moines, Polk County, Iowa, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. Operational since 2014, the site has a reported power capacity of 360 MW, drawing electricity from Midamerican Energy Co on the MISO grid.

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
24%
Fossil right now
62%
Grid operator
MISO
  • Natural Gas33.4%
  • Coal28.2%
  • Solar13.1%
  • Imports11.0%
  • Nuclear9.7%
  • Other3.0%
  • Wind1.6%

Real-time generation mix for the MISO grid this site draws from, as of Jul 15, 2026, 9:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.8 mi
Unknown132148
Transmission line
1.4 mi
161 kV line
Municipal water
Served
West Des Moines Water Works

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~7.1M gpd
Direct (onsite cooling)
~3.3M gpd
Indirect (its electricity)
~3.8M gpd

No measured record exists, so this is a low-confidence model from 360 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
58
PM2.5
Moderate
33
O3
Good

Air Quality Index from the nearest AirNow reporting area (Des Moines), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$49.1K
People of color
27%
Below poverty
15%
Tract population
5,169

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Walnut Creek Campus in West Des Moines, is 0.3 mi from this site (147 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.