Microsoft data center, Dallas County, IA
Dallas County, IA
Source: OpenStreetMap
Microsoft data center in Dallas County, IA is an operating facility, operated by Microsoft Corporation. DataCentersExposed has documented 106 MW of reported power capacity and a 39,146 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkThis operating hyperscale data center in Dallas County, Iowa is run by Microsoft Corporation, the same company that ultimately owns it. The site draws a reported 106 MW of power and covers 39,146 square feet, pulling electricity from Midamerican Energy Co on the MISO grid.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Corporation
- This facilityMicrosoft data center
The grid behind this site, right now
source: MISO · gridstatus- Wind21.6%
- Natural Gas21.4%
- Coal20.5%
- Solar18.4%
- Nuclear14.1%
- Imports2.2%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- Opposition to Microsoft Data Center spurs recall campaign, meeting shutdowns in LowellWZZM13.com· Jun 16, 2026
- China launches first wind-powered underwater data centreHVAC&R News· Jun 15, 2026
- ‘No Microsoft’: Rally held against proposed data center in Lowell TownshipAOL.com· Jun 15, 2026
- Microsoft’s Clean Energy Reversal Collides With Virginia’s Climate GoalsInside Climate News· Jun 15, 2026
- Neighbors of Microsoft data center site in Conover say noise, work interrupting their livesHickory Daily Record· Jun 15, 2026
- Noise at 2 a.m., red dust, no sleep: Life next to a data centerNewsweek· Jun 13, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2023 · term — yr · source
- Qualified Data Center Sales Tax Exemption$0State of Wisconsin · granted 2023 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2015 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2013 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2013 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 106 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Des Moines), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Woodland Hills Elementary School in West Des Moines, is 1.0 mi from this site (537 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.