Skip to content
DataCentersExposed
Proposed

Kenosha Microsoft Data Center

Kenosha, Kenosha County, WI

Source: Primary source

Kenosha Microsoft Data Center is a proposed data center in Kenosha County, WI, operated by Microsoft Corporation. DataCentersExposed has documented a 1,000,000 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Campaign · Decision pending

Take action

Kenosha, Wisconsin

0
supporters

Kenosha Microsoft Data Center in Kenosha, WI is contested. Petition: https://www.change.org/p/stop-the-opening-of-the-microsoft-data-center-in-kenosha? | Group: https://www.facebook.com/people/Kenoshans-Unite-Against-Microsoft-Data-Center/61583067017308/ | [email protected] Track what's being decided, when, and how to weigh in.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Microsoft Corporation
Operator
Microsoft Corporation
Est. capacity
~200-400 MW
Footprint
1,000,000 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Microsoft purchased approximately 240 acres on Burlington Rd in Kenosha County for a potential hyperscale data center campus. Development plans are still early and the project remains in the proposal stage. Announced investment: $3.3B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
3.6 mi
Paris · 138 kV
Transmission line
70 ft
345 kV line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for this record.
  • Qualified Data Center Sales Tax ExemptionTax break$0
    State of Wisconsin · granted 2023 · term yr · source
Statewide cost of this incentive

Wisconsin reported $40M in Qualified Data Centers sales/use tax exemption (Wis. Stat. § 77.54(70)) for FY2024 (Wisconsin Department of Revenue). Program-wide, not attributable to this site.

source · All Wisconsin subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Paris Elementary in Kenosha, is 2.7 mi from this site (261 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.