Microsoft Corporation - Mke 3B Data Center

4800 90TH ST · MOUNT PLEASANT, Richland County, WI

Source: Primary source

Microsoft Corporation - Mke 3B Data Center is a mapped data center in Richland County, WI. DataCentersExposed has documented 1 tracked EPA enforcement record at this site.

Reporting by · Updated Jun 12, 2026

Real parent
Operator
Interconnection
~75 MW
Utility
Wisconsin Electric Power Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

No description yet.

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
54%
Fossil right now
42%
Grid operator
MISO
  • Wind21.6%
  • Natural Gas21.4%
  • Coal20.5%
  • Solar18.4%
  • Nuclear14.1%
  • Imports2.2%
  • Other1.8%

Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Wisconsin reported $40M in Qualified Data Centers sales/use tax exemption (Wis. Stat. § 77.54(70)) for FY2024 (Wisconsin Department of Revenue). Program-wide, not attributable to this site.

source · All Wisconsin subsidies →

Water use

Modeled estimate~1.2M gpd
Direct (onsite cooling)
~456.5K gpd
Indirect (its electricity)
~792K gpd

No measured record exists, so this is a low-confidence model from 75 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO
  • Clean Air Actno penalty
    formal · reported 2025-07-31

Environmental permits

source: Permit register
  • Clean Air Act permitted sourceWI0000005510130249
    NAICS 518210; ECHO compliance status: Violation w/in 1 Year

Air quality near this site

source: AirNow
50
O3
Good
46
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Kenosha-Racine Lakeside), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$86.7K
People of color
31%
Below poverty
8%
Tract population
6,915

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Schulte Elementary in Sturtevant, is 1.2 mi from this site (313 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.