Microsoft Boydton — Region 1
Boydton, Mecklenburg County, VA
Microsoft Boydton — Region 1 is a mapped data center in Mecklenburg County, VA, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented 540 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
Microsoft Boydton Region 1 is a hyperscale data center in Boydton, Mecklenburg County, Virginia, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. Operational since 2010, the site carries a reported power capacity of 540 MW, drawing electricity from Mecklenburg Electric Cooperative within the PJM grid.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Data Center LLC
- This facilityMicrosoft Boydton — Region 1
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Hampton Roads cities are taking very different approaches to the future of data centers in the region - WTKRWTKR· Jul 10, 2026
- The data center boom comes to the Fredericksburg region - Roanoke TimesRoanoke Times· Jul 5, 2026
- Microsoft’s Emissions Surged 25% in 2025 During Data Center Boom - Bloomberg.comBloomberg.com· Jul 9, 2026
- Chevron Signs Deal with Microsoft to Power AI Data Center That Could Become One of the Country's Largest - People.comPeople.com· Jun 22, 2026
- Microsoft’s Virginia Data Center Growth Puts 24/7 Clean Energy Pledge Under Scrutiny - ESG NewsESG News· Jun 19, 2026
- Microsoft files to expand data center campus in Mecklenburg County, Virginia - Data Center DynamicsData Center Dynamics· Jun 4, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 540 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
540 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Mecklenburg County Middle in Baskerville, is 5.0 mi from this site (874 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.