Skip to content
DataCentersExposed
Mapped (unverified)hyperscale

Microsoft data center, Dallas County, IA

Dallas County, IA

Source: OpenStreetMap

Microsoft data center in Dallas County, IA is a mapped facility, operated by Microsoft Corporation. DataCentersExposed has documented a 250,490 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Microsoft Corporation
Operator
Microsoft Corporation
Est. capacity
~50-110 MW
Footprint
250,490 sq ft
Utility
Midamerican Energy Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Microsoft data center

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
54%
Fossil right now
42%
Grid operator
MISO
  • Wind21.6%
  • Natural Gas21.4%
  • Coal20.5%
  • Solar18.4%
  • Nuclear14.1%
  • Imports2.2%
  • Other1.8%

Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2023 · term yr · source
  • Qualified Data Center Sales Tax Exemption$0
    State of Wisconsin · granted 2023 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2015 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source

Water use

  • Reported withdrawal163.7K gpd
    2020 · matched by location (1,495 m, low confidence) · source
  • Reported withdrawal196.7K gpd
    2018 · matched by location (1,495 m, low confidence) · source
  • Reported withdrawal490.4K gpd
    2016 · matched by location (1,495 m, low confidence) · source
  • Reported withdrawal4.9K gpd
    2015 · matched by location (1,495 m, low confidence) · source
  • Reported withdrawal4.9K gpd
    2014 · matched by location (1,495 m, low confidence) · source
  • Reported withdrawal50.7K gpd
    2013 · matched by location (1,495 m, low confidence) · source

Location-matched records come from state withdrawal reporting, which redacts owner names in the public release. A nearby withdrawal point is circumstantial evidence — the distance and confidence shown are part of the claim.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Woodland Hills Elementary School in West Des Moines, is 1.7 mi from this site (537 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.