Microsoft
Gävleborgs län, Sweden
Source: OpenStreetMap
Microsoft is a mapped data center in Gävleborgs län, Sweden, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented a 254,210 sq ft footprint at this site. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkMicrosoft operates this data center in SE-X, Sweden, through Microsoft Data Center LLC, an entity ultimately owned by Microsoft Corporation. The site covers a footprint of 254,210 square feet. It has been mapped by DataCentersExposed.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Data Center LLC
- This facilityMicrosoft
The grid behind this site
source: Ember · EurostatA large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Microsoft tillkännager investering på 8.6 miljarder euro i datacenter i SinesPortugal Resident· Jun 11, 2026
- Så mycket energi slukar världens AI-datacenterDagens Nyheter· Jun 3, 2026
- Europas AI-framtid i fara när stigande elpriser driver datacenter utomlandsInvezz· May 18, 2026
- Datacenter belastar energisystemen i takt med AI:s tillväxtDagens.se· May 17, 2026
- Kongressen möter motstånd för att skynda på datacenter som AI:s miljöpåverkan granskasUnite.AI· Apr 29, 2026
- Världens största projekt för värmeåtervinning från datacenterFortum· Apr 18, 2026