Microsoft IAD11 is an operating data center in Loudoun County, VA, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented a 242,344 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkMicrosoft IAD11 is an operating data center in Loudoun County, Virginia, run by Microsoft Data Center LLC and owned through its parent, Microsoft Corporation. The site covers a reported 242,344 square feet. It draws power from Northern Virginia Electric Cooperative inside the PJM grid.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Data Center LLC
- This facilityMicrosoft IAD11
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Microsoft Reports Over $130 Billion in New Data Center Leases - Bloomberg.comBloomberg.com· Jul 29, 2026
- SVCC and Microsoft prepare military for data center careers - YourGV.comYourGV.com· Jul 27, 2026
- Microsoft’s Emissions Surged 25% in 2025 During Data Center Boom - Bloomberg.comBloomberg.com· Jul 9, 2026
- Chevron Signs Deal with Microsoft to Power AI Data Center That Could Become One of the Country's Largest - People.comPeople.com· Jun 22, 2026
- Microsoft’s Virginia Data Center Growth Puts 24/7 Clean Energy Pledge Under Scrutiny - ESG NewsESG News· Jun 19, 2026
- Microsoft files to expand data center campus in Mecklenburg County, Virginia - Data Center DynamicsData Center Dynamics· Jun 4, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit registerWhat this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~45 to 100 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Arcola Elementary in Aldie, is 0.8 mi from this site (810 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.