DataCentersExposed tracks 118 AI data centers in Ohio — 10 operating and 42 in the pipeline — across 32 counties, drawing 23.8 GW of reported power demand from 19 tracked corporate operators. Ohio's data-center tax break is projected to cost the state $130.4M in forgone revenue in FY2024.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
118
data centers
Operating
10
live today
Pipeline
42
proposed / building
Demand
23.8 GW
48 w/ capacity
Counties
32
touched
Operators
19
corporate parents
The story so far

Ohio at a glance

The largest footprint in Ohio belongs to Amazon.com, Inc., behind 27 tracked facilities. Alphabet Inc., Meta Platforms, Inc., and Vantage Data Centers Holdings, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Franklin County leads Ohio with 20 facilities and a composite risk score of 54/100. Licking County and Union County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Ohio is not done growing. 42 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 8 state bills mentioning data centers and 6 recent news items are tracked for Ohio below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 5 standardized 36 MW campuses in Ohio by 2035 — roughly 180 MW of new electricity demand and ~174 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 29 campuses (1.0 GW). For scale, we currently track 118 real data centers in Ohio (23.8 GW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth3
    108 MW · ~104 M gal/yr cooling water
  • Moderate growth5
    180 MW · ~174 M gal/yr cooling water
  • High growth14
    504 MW · ~487 M gal/yr cooling water
  • Higher growth29
    1.0 GW · ~1.0 billion gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Ohio (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

Who's building

Top operators in Ohio

What the tax break costs

The taxpayer price tag

via Ohio Department of Taxation
$130.4Min forgone state revenue, FY2024 (state projection)
1.53 Sales of qualified tangible personal property used in an eligible computer data center ... Estimate (Dollars in millions): FY 2024 $130.4 FY 2025 $135.8 FY 2026 $141.8 FY 2027 $148.0

Program-wide cost of Ohio's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

147 of 118 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Stargate Data CenterBristolville 25 Developer LLCProposedTrumbull1,500
Amazon Jeffersonville Data CenterAmazon.com, Inc.ProposedFayette1,184
Vantage Data CenterVantage Data Centers Holdings, LLCProposedFairfield800
AWS Delaware County (proposed)Amazon.com, Inc.ProposedDelaware600
Google Union County (proposed)Alphabet Inc.ProposedUnion600
QTS Van WertQTS Realty Trust, LLCProposedVan Wert County500
Aberdeen Data CenterProposedAdams400
Project MilaPrologisProposedButler240
EdgeConneX Ashville Data CenterEdgeConneX, Inc.ProposedPickaway200
Logistix Data CenterLogistix Property GroupProposedButler200
Mara HoldingsProposedMonroe200
Slavic Village Data CenterLakeland Equity GroupProposedCuyahoga150
Urbana Technology HubThor EquitiesProposedChampaign100
Karis Critical Data CenterProposedLicking36
COL 5 (Cologix) Data CenterProposedDelaware25
Aligned Conesville / CoshoctonAligned Energy Holdings, LPProposedCoshocton County
Aligned Data CenterProposedCoshocton
Amazon Project GalaxyAmazon.com, Inc.ProposedShelby
Bistrozzi LLC Data CenterProposedAllen
Franklin Furnace Data CenterAlphabet Inc.ProposedScioto
J5 LLC Data CenterCleanviewProposedMiami
Johnstown Data Center (Beech Rd.)ProposedLicking
Microsoft Licking County (Heath/Hebron/New Albany)Microsoft Data Center LLCProposedLicking County
Monclova Data CenterProposedLucas
OpenAI Stargate LordstownOpenAIProposedTrumbull
Oregon Data CenterProposedLucas
PRSM Data CenterProposedPreble
Pacifico Data CenterProposedPickaway
Project BOSCAlphabet Inc.ProposedAllen
Project CosmosAmazon.com, Inc.ProposedUnion
Project TritonProposedSummit
Ravel Data CenterStrataProposedLawrence
Sammis Power Plant Data CenterProposedJefferson
Waterville Data CenterProposedLucas
SoftBank Data Center/PORTS Technology CampusSoftbank/Open AI (unconfirmed)Under constructionPike9,200
AWS New Albany Campus 3 (expansion)Amazon.com, Inc.Under constructionLicking1,100
Meta Bowling Green Data Center/ Project AccordionMeta Platforms, Inc.Under constructionWood514
EdgeConneX New Albany Data CenterEdgeConneX, Inc.Under constructionLicking120
Aligned Sandusky (Northeast Ohio)Aligned Energy Holdings, LPUnder constructionErie County96
Amazon Sunbury Data CenterUnder constructionDelaware
CyrusOne COL-1Under constructionLicking
Microsoft Licking County Campus 1Microsoft CorporationPermittedLicking900
AWS New Albany Campus 2Amazon.com, Inc.Mapped (unverified)Licking800
MetaMeta Platforms, Inc.Mapped (unverified)Licking691
AWS New Albany Campus 1Amazon.com, Inc.Mapped (unverified)Licking600
Google NBY-3Alphabet Inc.Mapped (unverified)Licking543
Google New AlbanyAlphabet Inc.OperatingLicking480
Meta New AlbanyMeta Platforms, Inc.Mapped (unverified)Licking420
Wilmington Data CenterAmazon.com, Inc.BlockedClinton400
Google LancasterGoogle LLCMapped (unverified)Fairfield164
Lakeland Equity Group Data CenterWithdrawnCuyahoga150
Viking Data CentersOperatingSummit150
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Franklin73
Cologix COL1Cologix, Inc.Mapped (unverified)33
CyrusOne Cincinnati-Mason CIN3CyrusOne LLCOperatingWarren30
DataCenter.BZ - Worthington-ColumbusMapped (unverified)18
CyrusOne Cincinnati-LebanonCyrusOne LLCOperatingWarren14
CyrusOne CIN2CyrusOne LLCOperatingHamilton13
H5 Data CenterPrime Data CentersOperatingCuyahoga10
Cmh3OperatingDelaware7
Expedient Columbus - DublinExpedient, LLCMapped (unverified)4.8
CyrusOne Cincinnati-Hamilton CIN4CyrusOne LLCOperatingButler4.73
Expedient Cleveland - 151 NEOExpedient, LLCMapped (unverified)4.7
Expedient Cleveland - 152 NEOExpedient, LLCMapped (unverified)2
H5 Data Centers Cincinnati IIH5 Data CentersMapped (unverified)2
Expedient Columbus - Upper ArlingtonExpedient, LLCMapped (unverified)1.6
ark data centers - Canton,OHMapped (unverified)1.5
180 E Broad St.Mapped (unverified)
Aligned Data CentersPrime Data CentersMapped (unverified)Erie
Amazon AWS: Hilliard Data CenterAmazon.com, Inc.Mapped (unverified)Franklin
Amazon New Albany: Jug and Beach RoadAmazon.com, Inc.Mapped (unverified)Licking
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Licking
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Franklin
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Union
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Franklin
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Union
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Franklin
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Union
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Franklin
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Licking
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services CMH50Amazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services CMH53Amazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services CMH59Amazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services CMH56Amazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services CMH62Amazon.com, Inc.Mapped (unverified)Licking
Amazon Web Services Datacenter ComplexAmazon.com, Inc.Mapped (unverified)Licking
Amplex DC0Mapped (unverified)
BlueBridge Networks | Downtown ClevelandMapped (unverified)
Bresco Broadband Data CenterMapped (unverified)
Carrier Services GroupMapped (unverified)Mahoning
Centersquare Columbus (CMH1)CenterSquare (formerly Cyxtera)Mapped (unverified)
Citynet ColumbusMapped (unverified)
Cogent AkronCogent CommunicationsMapped (unverified)
Cogent Cleveland 2Cogent CommunicationsMapped (unverified)
Cologix COL2Cologix, Inc.Mapped (unverified)
Cologix COL3Cologix, Inc.Mapped (unverified)
Compugen New AlbanyMapped (unverified)Franklin
Compugen New AlbanyMapped (unverified)Franklin
Continental PlazaMapped (unverified)
DartPoints Cincinnati, OH - CVG1Mapped (unverified)
DartPoints Dublin, OH - CMH1Mapped (unverified)
DataBank Cleveland (CLE1)Mapped (unverified)
Everstream Parma Data CenterMapped (unverified)
FairlawnGig Service CenterMapped (unverified)
Flexential CincinnatiFlexential Corp.OperatingButler
Fusion - ClevelandMapped (unverified)
GoogleAlphabet Inc.Mapped (unverified)Fairfield
GoogleAlphabet Inc.Mapped (unverified)Franklin
GoogleAlphabet Inc.Mapped (unverified)Fairfield
Google Lockbourne, OHAlphabet Inc.Mapped (unverified)Franklin
Google NBY-1Alphabet Inc.Mapped (unverified)Licking
Google NBY-2Alphabet Inc.Mapped (unverified)Licking
Google NBY-4Alphabet Inc.Mapped (unverified)Franklin
Google NBY-5Alphabet Inc.Mapped (unverified)Franklin
Google NBY-6Alphabet Inc.Mapped (unverified)Franklin
Google NBY-7Alphabet Inc.Mapped (unverified)Licking
H5 Data Centers CincinnatiH5 Data CentersMapped (unverified)
Involta IndependenceMapped (unverified)Cuyahoga
Involta-AkronOperatingSummit
Iron Mountain Data Center - Ohio (OHS-1)Mapped (unverified)
LSTI 401 MarketMapped (unverified)
Level(3) CincinnatiLumen TechnologiesMapped (unverified)
LexisNexus SpringfieldMapped (unverified)Clark
Lumen ClevelandLumen Technologies, Inc.Mapped (unverified)Cuyahoga
MetaMeta Platforms, Inc.Mapped (unverified)Licking
MetaMeta Platforms, Inc.Mapped (unverified)Licking
MetaMeta Platforms, Inc.Mapped (unverified)Licking
MetaMeta Platforms, Inc.Mapped (unverified)Licking
Microtronix Datacenter OttovilleMapped (unverified)
OppidanMapped (unverified)Franklin
QTS Nal 2 Dc1QTS Realty Trust, LLCMapped (unverified)Licking
QTS Nal 2 Dc2QTS Realty Trust, LLCMapped (unverified)Licking
QTS Nal1 Dc1QTS Realty Trust, LLCMapped (unverified)Licking
QTS Nal1 Dc2QTS Realty Trust, LLCMapped (unverified)Licking
Racksquared Data CentersMapped (unverified)
STACK New AlbanyStack Infrastructure, Inc.Mapped (unverified)Franklin
T5@ClevelandMapped (unverified)Cuyahoga
TJX Companies Data Center (New Albany, OH)Mapped (unverified)Franklin
Tech Mahindra ClevelandMapped (unverified)
Vantage Building 1Vantage Data Centers Holdings, LLCMapped (unverified)Licking
Vantage Building 2Vantage Data Centers Holdings, LLCMapped (unverified)Licking
Vantage Building 3Vantage Data Centers Holdings, LLCMapped (unverified)Licking
WOW! Business (Columbus Datacenter)Mapped (unverified)
WēConnect WestervilleMapped (unverified)
ark data centers - Cleveland, OHMapped (unverified)
ark data centers - Youngstown, OHMapped (unverified)

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.