ultimate parent
Expedient, LLC
DataCentersExposed tracks 13 data centers operated by Expedient, LLC across 8 states, with 28 MW of reported power capacity.
Source: GLEIF LEI
Reporting by Eric Keller
Facilities
13
tracked
States
8
footprint
Pipeline
0
proposed / building
Reported power
28 MW
13 facilities
Where Expedient, LLC builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Expedient Columbus - Dublin | Dublin, OH | Mapped (unverified) | 4.8 |
| Expedient Cleveland - 151 NEO | Cleveland, OH | Mapped (unverified) | 4.7 |
| Expedient Indianapolis | Carmel, IN | Mapped (unverified) | 4.4 |
| Expedient Boston | Medford, MA | Mapped (unverified) | 3.2 |
| Expedient Data Center | Phoenix, AZ | 2 | |
| Expedient Pittsburgh South | Pittsburgh, PA | 1.8 | |
| Expedient Columbus - Upper Arlington | Upper Arlington, OH | Mapped (unverified) | 1.6 |
| Expedient Milwaukee | Franklin, WI | Mapped (unverified) | 1.6 |
| Expedient Memphis | Memphis, TN | Mapped (unverified) | 1.5 |
| Expedient Tidepoint | MD | Mapped (unverified) | 1.5 |
| Expedient Owings Mills | Owings Mills, MD | 0.8 | |
| Expedient Phoenix | Phoenix, AZ | Mapped (unverified) | — |
| Expedient Pittsburgh - Nova Place | Pittsburgh, PA | Mapped (unverified) | — |