Skip to content
DataCentersExposed
ultimate parent

Meta Platforms, Inc.

DataCentersExposed tracks 50 data centers operated by Meta Platforms, Inc. across 21 states, of which 14 are proposed or under construction, with 14.4 GW of reported power capacity. Meta Platforms, Inc. has filed or built under 13 project codenames resolved here, including Balloonist LLC, DB Stu LLC, Goat Systems LLC.

Sources: SEC EDGAR, GLEIF LEI

Reporting by

Facilities
50
tracked
States
21
footprint
Pipeline
14
proposed / building
Reported power
14.4 GW
Codename decoder

Project codenames & aliases

Names this operator has filed or built under. We resolve them back to Meta Platforms, Inc. so a search for the codename finds the real company.

  • Balloonist LLC
  • DB Stu LLC
  • Goat Systems LLC
  • J5 LLC
  • Laidley LLC
  • Liames LLC
  • Orla LLC
  • Pelican Leap LLC
  • Raven Northbrook LLC
  • SICULUS LLC
  • Shaytura LLC
  • Toreak Acquisition Corp
  • Wurldwide LLC
50 facilities

Where Meta Platforms, Inc. builds

FacilityLocationStatusMW
Meta Project SeafoxEl Paso, TXProposed1,000
Meta Jeffersonville (proposed)INProposed407
Meta Data CenterBeloit, WIProposed
Meta Data CenterCheyenne, WYProposed
Meta Louisiana Data CenterLAUnder construction2,000
Meta El Paso Data CenterEl Paso, TXUnder construction1,000
Project DominoLebanon, INUnder construction1,000
Meta — Loudoun buildAshburn, VAUnder construction600
Meta Bowling Green Data Center/ Project AccordionBowling Green, OHUnder construction514
Meta Data CenterJeffersonville, INUnder construction407
Beaver Dam Meta Data CenterBeaver Dam, WIUnder construction220
Meta KunaKUNA, IDUnder construction198
Meta Data CenterTemple, TXUnder construction152
Meta Data CenterGraniteville, SCUnder construction100
Meta RPL-10X Hyperion/Project SucreRayville, LAOperating1,500
Meta Fort WorthFort Worth, TXOperating700
Meta Mesa CampusMesa, AZMapped (unverified)700
MetaOHMapped (unverified)691
Meta AltoonaAltoona, IAMapped (unverified)540
Meta PrinevillePrineville, ORMapped (unverified)540
Meta PapillionPapillion, NEMapped (unverified)480
Meta Eagle MountainEagle Mountain, UTMapped (unverified)460
Meta Newton CountySocial Circle, GAMapped (unverified)460
Meta New AlbanyOHMapped (unverified)420
MetaILMapped (unverified)250
Meta MontgomeryMONTGOMERY, ALMapped (unverified)100
Facebook Altoona Data Center 2IAMapped (unverified)
Facebook Altoona Data Center 5IAMapped (unverified)
Facebook Fort Worth DatacenterTXMapped (unverified)
MetaNCMapped (unverified)
MetaLos Lunas, NMMapped (unverified)
MetaIAMapped (unverified)
MetaORMapped (unverified)
MetaGAMapped (unverified)
MetaOHMapped (unverified)
MetaORMapped (unverified)
Meta Clonee 2 Data CenterMapped (unverified)
Meta Clonee 3 Data CenterMapped (unverified)
Meta Clonee 5 Data CenterMapped (unverified)
Meta Eagle Mountain Data CenterUTMapped (unverified)
Meta Gallatin Data CenterTNMapped (unverified)
Meta Henrico Data CenterVAMapped (unverified)
Meta Huntsville Data centerALMapped (unverified)
Meta Odense Data CenterMapped (unverified)
Meta RosemountROSEMOUNT, MNMapped (unverified)
Meta Sarpy Data centerNEMapped (unverified)
Meta Sarpy Data centerNEMapped (unverified)
Meta Singapore Data CenterSingaporeMapped (unverified)
Meta Stanton Springs Data CenterSocial Circle, GAMapped (unverified)
Metas datacenter i LuleåMapped (unverified)
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$84M
2022–2026
Filings
18
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$7.1Mfiling
2026
MCGINLEY LLC
Energy / nuclear
$90Kfiling
2026
STEWART STRATEGIES AND SOLUTIONS, LLC
TelecomLAWIntelligenceComputers / internet
$60Kfiling
2026
MEHLMAN CONSULTING, INC.
Energy / nuclear
$50Kfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$8.0Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$6.5Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$6.0Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.8Mfiling
2025
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.8Mfiling
2025
CAPITOL TAX PARTNERS, LLP
Taxes
$60Kfiling
2024
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$7.6Mfiling
2024
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIES
Environment
$5.9Mfiling

Amounts are each filing's total reported lobbying by Meta Platforms, Inc. (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.