Oppidan
Franklin County, OH
Source: OpenStreetMap
Oppidan is a mapped data center in Franklin County, OH. DataCentersExposed has documented a 89,315 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkOppidan is a mapped data center in Franklin County, Ohio, with a reported footprint of 89,315 square feet. The site draws power from the City of Columbus utility inside the PJM grid. Available records do not name an operator or ultimate parent for the project.
In the news
source: Google News- Beaver Dam Common Council Approves Second Data CenterDaily Dodge· Apr 7, 2026
- Oppidan data center outside Minneapolis rejectedData Center Dynamics· Mar 30, 2026
- Oppidan’s plan to build five data centers in Apple Valley is rejectedBring Me The News· Mar 30, 2026
- Apple Valley rejects plan for five data centers at former mining siteThe Business Journals· Mar 30, 2026
- BG has its own much smaller, less energy guzzling data center being built in Woodbridge Business ParkBG Independent News· Feb 10, 2026
- Second data center project proposed in Beaver DamWPR· Feb 4, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~15 to 40 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Columbus), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Britton Elementary School in Hilliard, is 0.4 mi from this site (450 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.