operator
Microsoft Data Center LLC
Ultimately owned by Microsoft Corporation
DataCentersExposed tracks 48 data centers operated by Microsoft Data Center LLC across 12 states, of which 11 are proposed or under construction, with 5.5 GW of reported power capacity. The ultimate corporate parent is Microsoft Corporation.
Reporting by Eric Keller
Facilities
48
tracked
States
12
footprint
Pipeline
11
proposed / building
Reported power
5.5 GW
48 facilities
Where Microsoft Data Center LLC builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Microsoft Sioux Falls (proposed) | Sioux Falls, SD | Proposed | 720 |
| Microsoft Cheyenne Expansion | Cheyenne, WY | Proposed | — |
| Microsoft Licking County (Heath/Hebron/New Albany) | New Albany, OH | Proposed | — |
| Microsoft Mishawaka | Mishawaka, IN | Proposed | — |
| Microsoft East Point — Douglas County | GA | Under construction | 750 |
| Microsoft Boydton — Region 2 | Boydton, VA | Under construction | 380 |
| Microsoft Malaga | Malaga, WA | Under construction | 360 |
| Microsoft East US 3 — Douglasville | Douglasville, GA | Under construction | — |
| Microsoft El Mirage (Copperwing) | El Mirage, AZ | Under construction | — |
| Microsoft Manassas (Hansen Farm) | Manassas, VA | Under construction | — |
| Microsoft Licking County Campus 1 | OH | Permitted | 900 |
| Microsoft Quincy | Quincy, WA | Mapped (unverified) | 600 |
| Microsoft Boydton — Region 1 | Boydton, VA | Mapped (unverified) | 540 |
| Microsoft San Antonio (Quarry) | San Antonio, TX | Mapped (unverified) | 380 |
| Microsoft West Des Moines | West Des Moines, IA | Mapped (unverified) | 360 |
| Microsoft West Jordan | West Jordan, UT | Mapped (unverified) | 220 |
| Microsoft Goodyear Campus | Goodyear, AZ | 143 | |
| Microsoft | — | Mapped (unverified) | 106 |
| Ams12 | — | Mapped (unverified) | — |
| Cph01 | — | Mapped (unverified) | — |
| Cph07 | — | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft | Schwechat | Mapped (unverified) | — |
| Microsoft | — | Mapped (unverified) | — |
| Microsoft - Azure Datacenter | Northlake, IL | Mapped (unverified) | — |
| Microsoft Boydton Data Center | VA | Mapped (unverified) | — |
| Microsoft CYS Datacenter | WY | Mapped (unverified) | — |
| Microsoft DUB10 | — | Mapped (unverified) | — |
| Microsoft Data Center | — | Mapped (unverified) | — |
| Microsoft Data Center 2 | VA | Mapped (unverified) | — |
| Microsoft Datacenter | — | Mapped (unverified) | — |
| Microsoft EAT03 | East Wenatchee, WA | Mapped (unverified) | — |
| Microsoft EAT04 | WA | Mapped (unverified) | — |
| Microsoft IAD11 | VA | — | |
| Microsoft Ireland | Belfast | Mapped (unverified) | — |
| Microsoft MAD01 | — | Mapped (unverified) | — |
| Microsoft MEL05 | — | Mapped (unverified) | — |
| Microsoft MEL07 | — | Mapped (unverified) | — |
| Microsoft MEL11 | — | Mapped (unverified) | — |
| Microsoft Newport data centre | Newport | Mapped (unverified) | — |
| Microsoft SYD06 Data Centre | — | Mapped (unverified) | — |
| Microsoft San Antonio | San Antonio, TX | Mapped (unverified) | — |
| Microsoft TRP3 (SAT46) | TX | Mapped (unverified) | — |
| Phx-11 | Goodyear, AZ | Mapped (unverified) | — |