Meta Mesa Campus is a mapped data center in Maricopa County, AZ, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc.. DataCentersExposed has documented 700 MW of reported power capacity and a 750,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
Meta Mesa Campus is a hyperscale data center in Mesa, Maricopa County, Arizona, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc. Operational since 2023, the site has a reported power capacity of 700 MW.
Operator chain
- Ultimate parentMeta Platforms, Inc.
- Files asFacebook USA, Inc.
- This facilityMeta Mesa Campus
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Data Center Backlash Turns to Threats and Violence as Anger SpreadsNewsweek· Jun 19, 2026
- AI Data Center Parts Maker Xnrgy Said to Mull $10 Billion SaleBloomberg.com· Jun 4, 2026
- Data center project in Mesa moving forwardKTAR News 92.3 FM· May 17, 2026
- Rosendin Electric announces Chandler regional HQKTAR News 92.3 FM· May 17, 2026
- 2M-square-foot data center planned in East Valley cityyourvalley.net· May 15, 2026
- Japanese company's East Valley data center campus moves forwardThe Business Journals· May 14, 2026
Data-center discussions in Maricopa County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Arizona reported $38.5M in Computer Data Center TPT/Use Tax Exemption (Deduction Code 565; A.R.S. § 41-1519) for FY2025 (Arizona Department of Revenue, Office of Economic Research and Analysis). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 700 MW (disclosed IT power): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Salt River Pima-Maricopa Indian Community), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Self Development Eastmark Academy in Mesa, is 0.9 mi from this site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.