Facebook Altoona Data Center 2
Polk County, IA
Source: OpenStreetMap
Facebook Altoona Data Center 2 is a mapped data center in Polk County, IA, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc.. DataCentersExposed has documented a 307,370 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkFacebook Altoona Data Center 2 is a mapped data center in Polk County, Iowa, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc. The site covers 307,370 square feet and draws power from Midamerican Energy Co within the MISO grid.
Operator chain
- Ultimate parentMeta Platforms, Inc.
- Files asFacebook USA, Inc.
- This facilityFacebook Altoona Data Center 2
The grid behind this site, right now
source: MISO · gridstatus- Wind21.6%
- Natural Gas21.4%
- Coal20.5%
- Solar18.4%
- Nuclear14.1%
- Imports2.2%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- US Army Warns Lawmakers Draft Legislation Risks Data Center PushBloomberg· Jun 5, 2026
- AI Data Center Boom Risks Breakup of Biggest US Power Grid OperatorBloomberg· Jun 4, 2026
- Did Mark Zuckerberg's data center 'dry up' Rio Grande? Here's what records showSnopes· Jun 4, 2026
- China fueling anti-data center sentiment across US, Trump admin and ‘Shark Tank’ star Kevin O’Leary claimNew York Post· May 29, 2026
- AI data centre power surge threatens US grid stability and consumer costsGreen Building Africa· May 22, 2026
- Balancing Data Center Growth with American Agriculture | Market IntelAmerican Farm Bureau Federation· Apr 23, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Meta Platforms, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Des Moines), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Willowbrook Elementary in Altoona, is 1.7 mi from this site (533 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.