Meta Eagle Mountain

Eagle Mountain, Utah County, UT

Meta Eagle Mountain is a mapped data center in Utah County, UT, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc.. DataCentersExposed has documented 460 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Meta Platforms, Inc.
Operator
Facebook USA, Inc.
Power
460 MW
Utility
Pacificorp
Grid
PACW, PACE
Attribution & capacity confidence:mediumprovenance JSON

Overview

Meta Eagle Mountain is a hyperscale data center in Eagle Mountain, Utah County, Utah, operated by Facebook USA, Inc. and ultimately owned by Meta Platforms, Inc. Operational since 2018, the site carries a reported power capacity of 460 MW, drawing electricity from Pacificorp within the PACW and PACE balancing authorities.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
4.8 mi
Unknown201760 · 115 kV
Transmission line
0.7 mi
345 kV line
Municipal water
Served
Eagle Mountain City

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Data-center discussions in Utah County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Utah County Committee
Feb 13, 2023 · 1 data-center mention
Utah County Board
Oct 9, 2020 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~9.8M gpd
Direct (onsite cooling)
~5.8M gpd
Indirect (its electricity)
~4M gpd

No measured record exists, so this is a low-confidence model from 460 MW (disclosed IT power): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
0
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Timpanogos Cave National Monument), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$100.5K
People of color
19%
Below poverty
3%
Tract population
8,086

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Eagle Valley School in Eagle Mountain, is 937 ft from this site (970 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.