Oregon

DataCentersExposed tracks 73 AI data centers in Oregon — 17 operating and 4 in the pipeline — across 14 counties, drawing 4.9 GW of reported power demand from 16 tracked corporate operators. Oregon's data-center tax break cost local governments $26.9M in forgone revenue in FY2025.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
73
data centers
Operating
17
live today
Pipeline
4
proposed / building
Demand
4.9 GW
32 w/ capacity
Counties
14
touched
Operators
16
corporate parents
The story so far

Oregon at a glance

The largest footprint in Oregon belongs to Amazon.com, Inc., behind 21 tracked facilities. Meta Platforms, Inc., Flexential Corp., and Digital Realty Trust, Inc. round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Washington County leads Oregon with 31 facilities and a composite risk score of 42/100. Crook County and Morrow County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Oregon is not done growing. 4 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 1 state bill mentioning data centers and 6 recent news items are tracked for Oregon below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 14 standardized 36 MW campuses in Oregon by 2035 — roughly 504 MW of new electricity demand and ~487 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 79 campuses (2.8 GW). For scale, we currently track 73 real data centers in Oregon (4.9 GW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth10
    360 MW · ~348 M gal/yr cooling water
  • Moderate growth14
    504 MW · ~487 M gal/yr cooling water
  • High growth39
    1.4 GW · ~1.4 billion gal/yr cooling water
  • Higher growth79
    2.8 GW · ~2.8 billion gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Oregon (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

Who's building

Top operators in Oregon

What the tax break costs

The taxpayer price tag

via Crook County, Oregon (audited financial statements

Program-wide cost of Oregon's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Identified abatements

Per-deal tax breaks on record

primary-source disclosures
$16.7M disclosed across 1 program
  • Long-Term Rural Enterprise Zone (Morrow County School District 1)$16.7M

Specific incentive records we have matched in Oregon (state certified-exemption lists, agreements, and disclosures) — most have no public per-site dollar value, so a count is shown rather than an invented figure.

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

91 of 73 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Amazon Data CenterAmazon.com, Inc.ProposedMorrow1,200
AWS Arlington Data Center CampusAmazon Data Services, Inc.ProposedGilliam County
Sabey Umatilla CampusSabey Data CentersUnder constructionUmatilla County100
Crane Data CentersUnder constructionWashington
Meta PrinevilleMeta Platforms, Inc.Mapped (unverified)Crook540
AWS HillsboroAmazon.com, Inc.Mapped (unverified)Washington460
Apple PrinevilleApple Inc.Mapped (unverified)Crook320
Digital Realty HillsboroDigital Realty Trust, Inc.Mapped (unverified)Washington220
Google Data Center The Dalles OregonAlphabet Inc.OperatingWasco185
OracleOracle CorporationMapped (unverified)Washington94
Flexential Portland - Hillsboro 5Flexential Corp.OperatingWashington36
Digital Realty PDX10 Data CenterDigital Realty Trust, Inc.OperatingWashington27
QTS Data Center - Hillsboro 1QTS Realty Trust, LLCOperatingWashington24
Stack Infrastructure - POR02Stack Infrastructure, Inc.OperatingWashington24
La Pine Data CenterBox MinerBlockedDeschutes20
Flexential Portland - Hillsboro 2Flexential Corp.OperatingWashington18
Flexential Portland - Hillsboro 1Flexential Corp.OperatingWashington12
Flexential Portland - Hillsboro 3Flexential Corp.OperatingWashington12
Flexential Portland - Hillsboro 4Flexential Corp.OperatingWashington12
Portland Edge Data Center (EDC) campusOperatingWashington9
Stack Infrastructure - POR01Stack Infrastructure, Inc.Mapped (unverified)Washington4
Adobe Data CenterPrime Data CentersMapped (unverified)Washington
Aligned DC - PDX-01Aligned Energy Holdings, LPMapped (unverified)Washington
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Morrow
Amazon Web ServicesAmazon.com, Inc.Mapped (unverified)Umatilla
AppleApple Inc.Mapped (unverified)Crook
AppleApple Inc.Mapped (unverified)Crook
BendTelMapped (unverified)
Clackamas ESD DatacenterMapped (unverified)
Corepacket PDX-1Mapped (unverified)
Crane DC - PortlandMapped (unverified)Washington
Date Center West - EugeneOperatingLane
Date Center West - EugeneOperatingJackson
Digital Fortress - Portland 1InteractiveOperatingMultnomah
Digital Fortress - Portland 2OperatingWashington
Digital Fortress - Portland 3OperatingWashington
Digital Realty PDX11 Data CenterDigital Realty Trust, Inc.Mapped (unverified)Washington
Digital Realty PDX11 Data CenterDigital Realty Trust, Inc.Mapped (unverified)Washington
EdgeConneX - PortlandEdgeConneX, Inc.Mapped (unverified)Washington
EdgeConneX Hillsboro (EDCPOR02)Mapped (unverified)
EdgeConneX Portland (EDCPOR01)Mapped (unverified)
Flexential Portland - Hillsboro 4 ExpansionFlexential Corp.Mapped (unverified)Washington
Fort Rock DCOperatingDeschutes
GoogleAlphabet Inc.Mapped (unverified)Wasco
Google Taylor Lake Data CenterAlphabet Inc.Mapped (unverified)Wasco
H5 DC - PortlandH5 Data CentersOperatingMultnomah
Hemlock PlazaMapped (unverified)
LCOG Park PlaceMapped (unverified)
LightPoint CorporationMapped (unverified)
MetaMeta Platforms, Inc.Mapped (unverified)Crook
MetaMeta Platforms, Inc.Mapped (unverified)Crook
MetaMeta Platforms, Inc.Mapped (unverified)Crook
MetaMeta Platforms, Inc.Mapped (unverified)Crook
MetaMeta Platforms, Inc.Mapped (unverified)Crook
MetaMeta Platforms, Inc.Mapped (unverified)Crook
NTT RagingWire DC - HillsboroNTT Global Data CentersOperatingWashington
OVHcloud - HillsboroMapped (unverified)Washington
Opus Interactive Hillsboro (HIO01)InteractiveMapped (unverified)
Oregon State Data CenterMapped (unverified)Marion
PtcMapped (unverified)Linn
Ptor1Mapped (unverified)
Percheron DCMapped (unverified)Morrow
Percheron DCMapped (unverified)Morrow
Pittock BlockMapped (unverified)Multnomah
Prime Data Centers (Oregon)Prime Data CentersMapped (unverified)Washington
QTS Data Center - Hillsboro 2QTS Realty Trust, LLCMapped (unverified)Washington
QTS Data Center - Hillsboro 3QTS Realty Trust, LLCMapped (unverified)Washington
Roundhouse Data CenterWithdrawnHood River
Siemens EDA - HDC / Data CenterMapped (unverified)Clackamas
Stack Infrastructure - POR03Stack Infrastructure, Inc.Mapped (unverified)Washington
TGN HillsboroMapped (unverified)Washington
US Signal - OR01 BendOperatingDeschutes
University of OregonMapped (unverified)
Verizon Hillsboro (Tanasbourne) Data CenterVerizon Communications Inc.Mapped (unverified)Washington
amazon web servicesAmazon.com, Inc.Mapped (unverified)Morrow

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.