Skip to content
DataCentersExposed
ultimate parent

Stack Infrastructure, Inc.

⚑ Withholds its owner

Stack Infrastructure, Inc. told the global LEI registry that it has a parent company but declined to name it (parent is non-public). Most data-center operators with a parent disclose it; this one does not. GLEIF Level-2

DataCentersExposed tracks 23 data centers operated by Stack Infrastructure, Inc. across 7 states, of which 6 are proposed or under construction, with 1.5 GW of reported power capacity.

Source: GLEIF LEI

Reporting by

Facilities
23
tracked
States
7
footprint
Pipeline
6
proposed / building
Reported power
1.5 GW
23 facilities

Where Stack Infrastructure, Inc. builds

FacilityLocationStatusMW
Stack Data CenterDanville, VAProposed299
Neon At Celebrate Virginia SouthFredericksburg, VAProposed
Stack Temple CampusTemple, TXUnder construction600
STACK South Dallas (Lancaster)Lancaster, TXUnder construction220
STACK Atlanta ATL02Lithia Springs, GAUnder construction160
STACK Infrastructure SVY03A Data Center CampusHayward, CAUnder construction50
STACK InfrastructureSan Jose, CAOperating118
NVA06 CampusLeesburg, VAOperating48
Stack Infrastructure - POR02Hillsboro, OROperating24
Stack Infrastructure - POR01Hillsboro, ORMapped (unverified)4
Gen01Plan-les-OuatesOperating
Rechenzentrum EllhofenEllhofenOperating
Rechenzentrum OstermiethingOstermiethingOperating
STACK Chicago CHI01ILMapped (unverified)
STACK Infrastructure Data Center - SI NVA06A LLCVAOperating
STACK Infrastructure OSL04Mapped (unverified)
Stack Mill1bMapped (unverified)
STACK NVA01A - Northern VirginiaVAMapped (unverified)
STACK New AlbanyOHMapped (unverified)
Stack Svy02CAMapped (unverified)
Stack Infrastructure - POR03Hillsboro, ORMapped (unverified)
Stack Infrastructure MEL01AMapped (unverified)
Stack Infrastructure OSLO1AMapped (unverified)
Federal lobbying

Lobbying Washington

via Senate LDA
Reported spend
$830K
2024–2026
Filings
9
on data-center / energy issues
PeriodLobbyist / firmIssuesAmount
2026
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$110Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$90Kfiling
2025
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$80Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$150Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Computers / internetEnergy / nuclear
$100Kfiling
2024
AKIN GUMP STRAUSS HAUER & FELD
Energy / nuclearComputers / internet
filing

Amounts are each filing's total reported lobbying by Stack Infrastructure, Inc. (or firms it retained) for quarters in which data-center, energy, water, or tax issues were lobbied — not a data-center-only figure. Source: U.S. Senate Office of Public Records.

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.