DataCentersExposed tracks 27 AI data centers in Washington County, Oregon — 10 operating and 1 in the pipeline, drawing 928 MW of reported power demand, led by Flexential Corp.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
27
Operating
10
Pipeline
1

Reporting by · Updated May 29, 2026

Risk breakdown
42Moderate
  • Project exposure · 44
  • Power demand · 39
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Washington County

Facilities here with disclosed capacity draw 928 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Flexential Corp. has the largest presence in Washington County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 5 standardized 36 MW campuses in Washington County by 2035 — roughly 180 MW of new electricity demand and ~174 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 25 campuses (900 MW). For scale, we currently track 27 real data centers in Washington County (928 MW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth5
    180 MW · ~174 M gal/yr cooling water
  • Moderate growth5
    180 MW · ~174 M gal/yr cooling water
  • High growth12
    432 MW · ~418 M gal/yr cooling water
  • Higher growth25
    900 MW · ~870 M gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Washington County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

27 facilities

Every tracked facility

FacilityOperatorStatusMW
Crane Data Centers
Forest Grove
Under construction
AWS Hillsboro
Hillsboro
Amazon.com, Inc.Mapped (unverified)460
Digital Realty HillsboroDigital Realty Trust, Inc.Mapped (unverified)220
Oracle
Hillsboro
Oracle CorporationMapped (unverified)94
Flexential Portland - Hillsboro 5
Hillsboro
Flexential Corp.Operating36
Digital Realty PDX10 Data Center
Hillsboro
Digital Realty Trust, Inc.Operating27
QTS Data Center - Hillsboro 1
Hillsboro
QTS Realty Trust, LLCOperating24
Stack Infrastructure - POR02
Hillsboro
Stack Infrastructure, Inc.Operating24
Flexential Portland - Hillsboro 2
Hillsboro
Flexential Corp.Operating18
Flexential Portland - Hillsboro 1
Hillsboro
Flexential Corp.Operating12
Portland Edge Data Center (EDC) campus
Hillsboro
Operating9
Stack Infrastructure - POR01
Hillsboro
Stack Infrastructure, Inc.Mapped (unverified)4
Adobe Data Center
Hillsboro
Prime Data CentersMapped (unverified)
Aligned DC - PDX-01
Hillsboro
Aligned Energy Holdings, LPMapped (unverified)
Crane DC - Portland
Forest Grove
Mapped (unverified)
Digital Fortress - Portland 2
Beaverton
Operating
Digital Fortress - Portland 3
Beaverton
Operating
Digital Realty PDX11 Data Center
Hillsboro
Digital Realty Trust, Inc.Mapped (unverified)
EdgeConneX - Portland
Hillsboro
EdgeConneX, Inc.Mapped (unverified)
NTT RagingWire DC - Hillsboro
Hillsboro
NTT Global Data CentersOperating
OVHcloud - Hillsboro
Hillsboro
Mapped (unverified)
Prime Data Centers (Oregon)Prime Data CentersMapped (unverified)
QTS Data Center - Hillsboro 2
Hillsboro
QTS Realty Trust, LLCMapped (unverified)
QTS Data Center - Hillsboro 3
Hillsboro
QTS Realty Trust, LLCMapped (unverified)
Stack Infrastructure - POR03
Hillsboro
Stack Infrastructure, Inc.Mapped (unverified)
TGN Hillsboro
Hillsboro
Mapped (unverified)
Verizon Hillsboro (Tanasbourne) Data Center
Hillsboro
Verizon Communications Inc.Mapped (unverified)
Accountability

County commissioners

How the Washington County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.