Arizona

DataCentersExposed tracks 86 AI data centers in Arizona — 17 operating and 17 in the pipeline — across 5 counties, drawing 11.3 GW of reported power demand from 18 tracked corporate operators. Arizona's data-center tax break cost the state $38.5M in forgone revenue in FY2025.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
86
data centers
Operating
17
live today
Pipeline
17
proposed / building
Demand
11.3 GW
42 w/ capacity
Counties
5
touched
Operators
18
corporate parents
The story so far

Arizona at a glance

The largest footprint in Arizona belongs to CyrusOne LLC, behind 8 tracked facilities. Prime Data Centers, Microsoft Corporation, and QTS Realty Trust, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Maricopa County leads Arizona with 75 facilities and a composite risk score of 63/100. Pinal County and Pima County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Arizona is not done growing. 17 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 8 state bills mentioning data centers and 6 recent news items are tracked for Arizona below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 14 standardized 36 MW campuses in Arizona by 2035 — roughly 504 MW of new electricity demand and ~322 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 77 campuses (2.8 GW). For scale, we currently track 86 real data centers in Arizona (11.3 GW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth9
    324 MW · ~200 M gal/yr cooling water
  • Moderate growth14
    504 MW · ~322 M gal/yr cooling water
  • High growth38
    1.4 GW · ~583 M gal/yr cooling water
  • Higher growth77
    2.8 GW · ~749 M gal/yr cooling water

The model assigns ~66% of these campuses' cooling to evaporative water cooling in Arizona (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

Who's building

Top operators in Arizona

$38.5Min forgone state revenue, FY2025
“In FY 2025, businesses deducted an estimated $770.5 million for this purpose. Had the transactions been taxable at a 5% rate, they would have generated about $38.5 million in tax. [Summary table, Deduction Code 565: 38,527,463]”

Program-wide cost of Arizona's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Maricopa County751263
Pinal County2218
Pima County424
Cochise County1—4
Coconino County11—
Still contested

Pipeline & proposals

96 of 86 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Vermaland Data CenterVermaland LLCProposedPinal3,000
Arizona Land Consulting Co.—ProposedMaricopa1,500
Takanock Data Center/Project BaccaraDigitalBridgeProposedMaricopa700
Google Mesa (proposed)Alphabet Inc.ProposedMaricopa600
Project Blue MaranaBeale InfrastructureProposedPima250
MD-PHX1 Data CenterMenlo DigitalProposedMaricopa180
Data center: Davis-Monthan Air Force Base—ProposedPima—
Maricopa Data CenterFortescueProposedMaricopa—
Mesa Amazon Data Center 1Amazon.com, Inc.ProposedMaricopa—
Page Data CenterHuntley LLCProposedCoconino—
QTS PHX3 (Glendale)QTS Realty Trust, LLCUnder constructionMaricopa County750
QTS Pinal County CampusQTS Realty Trust, LLCUnder constructionPinal420
Prime Data CenterPrime Data CentersUnder constructionMaricopa240
Vantage GoodyearVantage Data Centers Holdings, LLCUnder constructionMaricopa County176
Aligned Data Centers Waddell CampusAligned Energy Holdings, LPUnder constructionMaricopa80
Microsoft El Mirage (Copperwing)Microsoft Data Center LLCUnder constructionMaricopa County—
Tract Phoenix Data CenterTractUnder constructionMaricopa—
Meta Mesa CampusMeta Platforms, Inc.Mapped (unverified)Maricopa700
AWS Mesa CampusAmazon.com, Inc.Mapped (unverified)Maricopa480
NTT PH1 DatacenterNTT Global Data CentersMapped (unverified)Maricopa200
Stream Data Centers PHX-1Prime Data CentersOperatingMaricopa200
Aligned Energy Data CenterAligned Energy Holdings, LPOperatingMaricopa180
MicrosoftMicrosoft CorporationMapped (unverified)Maricopa176
Microsoft Goodyear CampusMicrosoft CorporationOperatingMaricopa143
Stream Phoenix—Mapped (unverified)Maricopa77
QTSQTS Realty Trust, LLCOperatingMaricopa42
Iron Mountain AZP-1Iron Mountain IncorporatedOperatingMaricopa41
Edged Mesa Data CenterEdgedOperatingMaricopa36
H5 PhoenixH5 Data CentersOperatingMaricopa32
Flexential Phoenix - Deer ValleyFlexential Corp.OperatingMaricopa5.02
Phx1—OperatingMaricopa4
Expedient Data CenterExpedient, LLCOperatingMaricopa2
1GServers Data Center—Mapped (unverified)——
AZ Labs—Mapped (unverified)Maricopa—
Accelera Data Systems—Mapped (unverified)Maricopa—
Alembic Computer Services, Inc.—Mapped (unverified)Maricopa—
Alliance Technology—Mapped (unverified)Maricopa—
Apple Data CenterApple Inc.Mapped (unverified)Maricopa—
Compass Datacenters Phx I—Mapped (unverified)Maricopa—
Cyrusone - Chandler—Mapped (unverified)Maricopa—
Centersquare Phoenix (PHX1)CenterSquare (formerly Cyxtera)Mapped (unverified)——
Centersquare: Phoenix - (PHX1 - Mesa)CenterSquare (formerly Cyxtera)OperatingMaricopa—
Cogent Data CenterPrime Data CentersMapped (unverified)Maricopa—
Comarch—Mapped (unverified)Maricopa—
CyrusOne PHX1CyrusOne LLCOperatingMaricopa—
CyrusOne PHX3CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX4CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX4CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX5CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX6CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX7CyrusOne LLCMapped (unverified)Maricopa—
CyrusOne PHX8CyrusOne LLCMapped (unverified)Maricopa—
Data Storage CentersPrime Data CentersMapped (unverified)Maricopa—
DataBank Phoenix (PHX1)—Mapped (unverified)——
DataPro USA Web Development—Mapped (unverified)Maricopa—
Digital Realty Data CenterDigital Realty Trust, Inc.Mapped (unverified)Maricopa—
Digital Realty PHX10 (120 E Van Buren)Digital Realty Trust, Inc.Mapped (unverified)——
Digital Realty Phoenix PHX15Digital Realty Trust, Inc.OperatingMaricopa—
DirecTV—Mapped (unverified)Pima—
DirecTV—Mapped (unverified)Cochise—
EdgeConneX Data CenterEdgeConneX, Inc.OperatingMaricopa—
EdgeConneX PHX02 Data CenterEdgeConneX, Inc.Mapped (unverified)Maricopa—
EdgeCore—OperatingMaricopa—
Emailage—Mapped (unverified)Maricopa—
Expedient PhoenixExpedient, LLCMapped (unverified)——
GoDaddy - Gilbert—Mapped (unverified)Maricopa—
Google Data CenterAlphabet Inc.Mapped (unverified)Maricopa—
INAP Phoenix—Mapped (unverified)——
Iron Mountain AZP-2Iron Mountain IncorporatedOperatingMaricopa—
Iron Mountain Data Centers AZS-1Iron Mountain IncorporatedOperatingMaricopa—
J-Curve Technologies—Mapped (unverified)Maricopa—
K-Motion Interactive—Mapped (unverified)Maricopa—
L3Harris Technologies Inc—Mapped (unverified)Maricopa—
Login Tucson—Mapped (unverified)——
MDC Nogales—Mapped (unverified)——
Mecp1 Mesa Intermediate 1—Mapped (unverified)Maricopa—
Microsoft CORP - Olive Ave—Mapped (unverified)Maricopa—
Myndshift Technologies—Mapped (unverified)Maricopa—
Omnis Network—OperatingMaricopa—
OptimumHQ—Mapped (unverified)Maricopa—
Phx-10Microsoft CorporationMapped (unverified)Maricopa—
Phx-11Microsoft CorporationMapped (unverified)Maricopa—
Phx01 / Phx02 / Phx03 / Phx05—Mapped (unverified)Maricopa—
PhoenixNAP—OperatingMaricopa—
Profit Finder Pro Software—Mapped (unverified)Maricopa—
Project Blue TucsonBeale InfrastructureWithdrawnPima—
QTSQTS Realty Trust, LLCMapped (unverified)Maricopa—
QTS Phoenix (PHX1)—Mapped (unverified)——
Simply Bits DC1—Mapped (unverified)——
StrongMind—Mapped (unverified)Maricopa—
Sungard AS Scottsdale—Mapped (unverified)——
The Chatfield Group—Mapped (unverified)Maricopa—
US Signal AZ01 - Phoenix—Mapped (unverified)——
VaultLogix—Mapped (unverified)Maricopa—
Vintage Partners—WithdrawnMaricopa—
ark data centers - Tucson, AZ—Mapped (unverified)——

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.