Digital Realty Data Center
2055 East Technology Circle · Tempe, Maricopa County, AZ
Source: OpenStreetMap
Digital Realty Data Center is a mapped data center in Maricopa County, AZ, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented a 67,568 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkDigital Realty Data Center is a mapped colocation site in Tempe, Maricopa County, Arizona, run by Digital Realty Trust, Inc. Public records put its footprint at 67,568 square feet. No ultimate parent above Digital Realty Trust is identified in available records.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- 4 Singapore data centre REITs with dividend yields of up to 8%. What income investors may want to watchBeansprout· Jun 9, 2026
- The Power to ChangeSite Selection Magazine· Nov 2, 2024
- Cyxtera Data Center Leases – Who and What is at Risk?Dgtl Infra· Jul 6, 2023
- Saul REIT moves to update industrial zoning on parcels owned in Sterling, hasn't said for what useThe Business Journals· Jan 30, 2023
- Sila, previously Carter Validus, sells all its data centers to Mapletree for $1.3bnData Center Dynamics· May 20, 2021
- Digital Realty sells 10 US data centers, shares three in $1.4bn Mapletree dealData Center Dynamics· Sep 18, 2019
Data-center discussions in Maricopa County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Arizona reported $38.5M in Computer Data Center TPT/Use Tax Exemption (Deduction Code 565; A.R.S. § 41-1519) for FY2025 (Arizona Department of Revenue, Office of Economic Research and Analysis). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Gila River Indian Community), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Center For Educational Excellence in Tempe, is 0.9 mi from this site (319 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.