Skip to content
DataCentersExposed
Asia · data-center footprint

South Korea

DataCentersExposed tracks 12 AI data centers in South Korea — 0 operating and 0 in the pipeline — across 5 provinces, run by 4 tracked operators.

Sources: Methodology, Coverage scorecard

What powers South Korea's data centers

Ember · 2025
Carbon intensity
417
gCO₂/kWh
Clean electricity
40%
renewables + nuclear
Fossil electricity
60%
coal, gas & oil
Grid demand
625
TWh / year
Demand growth
+1.3%
per year

South Korea's electricity demand has grown +1.3%/yr (2015–2025). Every new data center competes for that same grid — already 261 MtCO₂ a year from generation.

Tracked
12
Operating
0
In pipeline
0
Reported power
0 MW
provinces
5
Operators
4
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

By province

Where the data centers are

Facilities

Tracked data centers

In the local press

Latest South Korea data-center coverage

Live headlines via Google News — in English and South Korea's local press.