Mapped (unverified)
Data center data center, Gyeonggi, South Korea
Gyeonggi, South Korea
Source: OpenStreetMap
전상동 in Gyeonggi, South Korea is a mapped facility. DataCentersExposed has documented a 36,003 sq ft footprint at this site. It runs on South Korea's grid, which was 60% fossil-fuelled at 417 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-15 MW
Footprint
36,003 sq ft
Grid carbon
417 gCO₂/kWh
Clean electricity
40%
Region
Gyeonggi
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
417 gCO₂/kWh
Clean electricity
40%
Fossil electricity
60%
National grid context, not this facility's own metering. Full country picture: South Korea data centers.