Mapped (unverified)colocation
KINX Bundang
Seongnam, Gyeonggi, South Korea
Source: Primary source
KINX Bundang is a mapped data center in Gyeonggi, South Korea. It runs on South Korea's grid, which was 60% fossil-fuelled at 417 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
417 gCO₂/kWh
Clean electricity
40%
Region
Gyeonggi
Overview
source: linkKINX Inc. — colocation facility (8 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
417 gCO₂/kWh
Clean electricity
40%
Fossil electricity
60%
National grid context, not this facility's own metering. Full country picture: South Korea data centers.
In the news
source: Google News (local + English)- 현대제철, H형강 통합 브랜드 ‘H ONE’ 론칭…AI 데이터센터·반도체 공략나눔경제뉴스· Oct 12, 2026
- 네이버, 亞 거린에너지와 AI 데이터센터 재생에너지 투자 나선다문화일보· Sep 16, 2026
- 성문전자, 성남 보유 부지에 '엣지 IDC' 개발 추진뉴스핌· Sep 3, 2026
- 성문전자, 2000억원 규모 엣지 데이터센터 사업 진출이데일리· Sep 3, 2026
- 성문전자, 2000억원 투입해 ‘엣지 IDC’ 사업 진출… 내년 착공·2029년 운영 목표파이낸스스코프· Sep 3, 2026
- 성문전자, 2000억원 규모 '4차 산업 핵심' 엣지 IDC 사업 진출…"상장사 최초"프라임경제· Sep 3, 2026
See something wrong or missing on this page? Suggest a correction.