NAVER data center, Sejong, South Korea
Sejong, South Korea
Source: OpenStreetMap
NAVER data center in Sejong, South Korea is a mapped facility, operated by NAVER. DataCentersExposed has documented a 256,450 sq ft footprint at this site. It runs on South Korea's grid, which was 60% fossil-fuelled at 417 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: link각 세종 is a data center in KR-50, South Korea, operated by NAVER, the South Korean internet company that ultimately owns it. The site, identified in records as a 네이버 data center, covers 256,450 square feet. It is currently mapped, and no power capacity, subsidy, or environmental details are confirmed in the available records.
Operator chain
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: South Korea data centers.
In the news
source: Google News (local + English)- 사토시홀딩스, ETRI 시맨틱 기술 적용…AI 데이터센터 공략 속도 : 네이버 블로그Naver Blog· Jun 16, 2026
- [LS ELECTRIC] LS ELECTRIC 투자 포인트 총정리: AI 데이터센터·온사이트 파워·유타공장 (2026_1Q)네이버 프리미엄콘텐츠· Jun 16, 2026
- [LS] LS 주가, 전력 슈퍼사이클과 AI 데이터센터 수혜로 리레이팅될까 (2026_1Q)네이버 프리미엄콘텐츠· Jun 15, 2026
- 가온전선, AI 데이터센터 전력 인프라 수혜 본격화 : 네이버 블로그Naver Blog· Jun 13, 2026
- NAVER, 엔비디아 손잡고 네오클라우드 진출…목표가 40만원↑-하나이데일리· Jun 8, 2026
- [필독!!] AI 시대, 지금 어디까지 왔나? - [부제] 미국 AI 데이터센터 현황 및 미래 전망네이버 프리미엄콘텐츠· May 28, 2026