South Korea · province
Gangwon State
DataCentersExposed tracks 1 AI data center in Gangwon State, South Korea — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: South Korea, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- NhnNHNMapped (unverified)
- 네이버데이터센터 각NHNMapped (unverified)
In the local press
Gangwon State data-center coverage
- [Video] Gangwon State Launches Full-Scale AI Industry Ecosystem연합뉴스· Jul 28, 2026
- 춘천 네이버 데이터센터 ‘각’의 교훈과 AI-반도체 강원 벨트의 과제브레이크뉴스· Jul 1, 2026
- AMFOC, ‘페이스 오브 방글라데시’ 성황리 개최스트레이트뉴스· Jun 24, 2024
- GS Group Gathers Momentum for One-Team Push, Donghae Data Center to Break Ground in November매일경제· Aug 25, 2026
- Investments in artificial intelligence (AI) data centers are continuing in Gangwon-do. In the East S..매일경제· Jul 20, 2026
- GS, Gangwon ink deal for 2.4 GW AI data center campus in DonghaeET Datacenters· Jul 9, 2026
Live headlines via Google News — in English and South Korea's local press.