Equinix Silicon Valley Campus
San Jose, Santa Clara County, CA
Equinix Silicon Valley Campus is a mapped data center in Santa Clara County, CA, operated by Equinix, Inc.. DataCentersExposed has documented 380 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
The Equinix Silicon Valley Campus is a colocation data center in San Jose, Santa Clara County, California, operated by Equinix, Inc. Operational since 2007, it draws a reported 380 MW of power capacity from Pacific Gas & Electric Co. within the CISO balancing authority.
Operator chain
- Ultimate parentEquinix, Inc.
- This facilityEquinix Silicon Valley Campus
The grid behind this site, right now
source: CAISO · gridstatus- Solar46.8%
- Natural Gas28.7%
- Wind9.2%
- Hydro7.3%
- Nuclear5.3%
- Geothermal1.8%
- Biomass0.9%
Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 10:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Equinix-occupied data center in California sold to Brookfield - Data Center DynamicsData Center Dynamics· May 18, 2026
- U.S. Data Center Colocation Market Report 2025-2030 Featuring Key DC Investors - Aligned, Compass, CyrusOne, DataBank, Digital Realty, Equinix, NTT, QTS Realty Trust, STACK Infrastructure, Vantage - ResearchAndMarkets.com - Business WireBusiness Wire· Sep 5, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 380 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (San Jose), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Sakamoto Elementary in San Jose, is 653 ft from this site (525 students). 6 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.