CoreSite Real Estate 3032 Coronado, L.P.

3020 Coronado Drive · Santa Clara, Santa Clara County, CA

Source: Primary source

CoreSite Real Estate 3032 Coronado, L.P. is a mapped data center in Santa Clara County, CA, operated by CoreSite, LLC and ultimately owned by American Tower Corporation. DataCentersExposed has documented 345 MW of reported power capacity and a 61,065 sq ft footprint at this site.

Reporting by · Updated Jun 13, 2026

Real parent
American Tower Corporation
Operator
CoreSite, LLC
Power
345 MW
Footprint
61,065 sq ft
Utility
CoreSite Real Estate 3032 Coronado, L.P.
Grid
CISO
Attribution & capacity confidence:highprimary source

Overview

source: link

EIA Plant 61482 (CoreSite Real Estate 3032 Coronado, L.P.). Generation tech: Petroleum Liquids. Reported capacity: 345.0 MW

Operator chain

The grid behind this site, right now

source: CAISO · gridstatus
Clean right now
71%
Fossil right now
29%
Grid operator
CAISO
  • Solar46.8%
  • Natural Gas28.7%
  • Wind9.2%
  • Hydro7.3%
  • Nuclear5.3%
  • Geothermal1.8%
  • Biomass0.9%

Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 10:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
856 ft
Northwestern · 60 kV
Transmission line
745 ft
60 kV line
Municipal water
Served
City Of Santa Clara

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~6.5M gpd
Direct (onsite cooling)
~3.5M gpd
Indirect (its electricity)
~3M gpd

No measured record exists, so this is a low-confidence model from 345 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
59
PM2.5
Moderate
33
O3
Good

Air Quality Index from the nearest AirNow reporting area (San Jose), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$138.4K
People of color
76%
Below poverty
17%
Tract population
8,473

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Bracher Elementary in Santa Clara, is 0.7 mi from this site (236 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.