CoreSite Real Estate 2972 Stender, L.P.
2972 Stender Way · Santa Clara, Santa Clara County, CA
Source: Primary source
CoreSite Real Estate 2972 Stender, L.P. is an operating data center in Santa Clara County, CA, operated by CoreSite, LLC and ultimately owned by American Tower Corporation. DataCentersExposed has documented 120 MW of reported power capacity and a 50,856 sq ft footprint at this site.
Reporting by Eric Keller · Updated Oct 12, 2026
Overview
source: linkEIA Plant 61464 (CoreSite Real Estate 2972 Stender, L.P.). Generation tech: Petroleum Liquids. Reported capacity: 120.0 MW
Operator chain
- Ultimate parentAmerican Tower Corporation
- Files asCoreSite, LLC
- This facilityCoreSite Real Estate 2972 Stender, L.P.
The grid behind this site, right now
source: CAISO · gridstatus- Solar59.3%
- Natural Gas24.3%
- Nuclear5.7%
- Wind4.3%
- Hydro3.2%
- Imports3.0%
- Geothermal2.0%
- Biomass1.1%
Real-time generation mix for the CAISO grid this site draws from, as of Aug 17, 2026, 8:05 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Data center location strategy: Why milliseconds matter for these specific AI applicationsThe Business Journals· Sep 10, 2026
- CoreSite acquires Silicon Valley office property zoned for data center redevelopmentData Center Dynamics· Feb 12, 2026
- CoreSite Drops $100M for Silicon Valley TrioCommercialSearch· Feb 11, 2026
- Data center developer buys Santa Clara buildings in $100M dealThe Real Deal· Feb 10, 2026
- Data center firm buys three South Bay tech buildings for $100 millionSiliconValley.com· Feb 9, 2026
- CoreSite Launches NY3 Data Center, Expanding AI-Optimized Capacity in the New York Metro AreaBusiness Wire· Sep 25, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Bracher Elementary in Santa Clara, is 0.7 mi from this site (236 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.