Tarrant County, Texas
DataCentersExposed tracks 12 AI data centers in Tarrant County, Texas — 2 operating and 4 in the pipeline, drawing 770 MW of reported power demand, led by Meta Platforms, Inc.. Its transparent data-center risk score is 0/100.
Sources: Methodology, Coverage scorecard
Reporting by Eric Keller · Updated May 29, 2026
- Project exposure · 23
- Power demand · 39
- Water draw · n/a
- Land footprint · n/a
What's happening in Tarrant County
Facilities here with disclosed capacity draw 770 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.
Meta Platforms, Inc. has the largest presence in Tarrant County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.
Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.
2035 Buildout Outlook
Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 40 standardized 36 MW campuses in Tarrant County by 2035 — roughly 1.4 GW of new electricity demand and ~1.4 billion gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 74 campuses (2.7 GW). For scale, we currently track 12 real data centers in Tarrant County (770 MW of reported power).
- High growth401.4 GW · ~1.4 billion gal/yr cooling water
- Higher growth742.7 GW · ~2.6 billion gal/yr cooling water
The model assigns ~100% of these campuses' cooling to evaporative water cooling in Tarrant County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.
These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.
Every tracked facility
| Facility | Operator | Status | MW |
|---|---|---|---|
| Black Mountain Data Center Fort Worth | — | Proposed | — |
| Edged Energy Outpost Data Center Fort Worth | Edged | Proposed | — |
| Edged Fort Worth Data Center Fort Worth | — | Proposed | — |
| CyrusOne/Eolian Data Center Fort Worth | CyrusOne/Eolian | Under construction | 70 |
| Meta Fort Worth Fort Worth | Meta Platforms, Inc. | 700 | |
| Alinged Data Center Mansfield | Prime Data Centers | Mapped (unverified) | — |
| Amazon Web Services | Amazon.com, Inc. | Mapped (unverified) | — |
| Cyxtera Dallas-Fort Worth Data Center | CenterSquare (formerly Cyxtera) | — | |
| Facebook Fort Worth Datacenter | Meta Platforms, Inc. | Mapped (unverified) | — |
| Novartis | — | Mapped (unverified) | — |
| QTS Data Center | Prime Data Centers | Mapped (unverified) | — |
| Verizon Wireless Mew Building | Verizon Communications Inc. | Mapped (unverified) | — |
County commissioners