Alinged Data Center is a mapped data center in Tarrant County, TX, operated by Prime Data Centers. DataCentersExposed has documented a 188,257 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkAlinged Data Center is a mapped colocation site in Mansfield, Tarrant County, Texas, run by Prime Data Centers. Records put its footprint at 188,257 square feet, with an existing note tying the location to Aligned Data Centers, LLC. The site draws power from Denton County Electric Cooperative, Inc. inside the ERCOT grid.
Operator chain
- Ultimate parentPrime Data Centers
- Files asPrime Data Centers
- This facilityAlinged Data Center
The grid behind this site, right now
source: ERCOT · gridstatus- Natural Gas38.9%
- Solar24.3%
- Wind17.8%
- Coal11.4%
- Nuclear7.4%
Real-time generation mix for the ERCOT grid this site draws from, as of Jul 15, 2026, 10:24 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- The Small-Town Revolt Against Big TechThe Nation· Jun 23, 2026
- Mansfield becomes first Massachusetts town to ban data centers: ‘A very pressing topic’Boston Herald· May 16, 2026
- Data center growth draws attention of natural gas producerherald-dispatch.com· Apr 25, 2026
- Here's where the proposed big data center sites are in the Pittsburgh region (map)The Business Journals· Mar 27, 2026
- Zoho co-founder Sridhar Vembu raises concerns over data centre expansion; says water and energy resources...Moneycontrol.com· Feb 28, 2026
- Hood County residents lose fight to temporarily pause data-center developmentFort Worth Star-Telegram· Feb 24, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Elizabeth Smith Academy in Mansfield, is 0.6 mi from this site (651 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.