Cyxtera Dallas-Fort Worth Data Center
14950 Kingsport Road · Tarrant County, TX
Source: OpenStreetMap
Cyxtera Dallas-Fort Worth Data Center is an operating data center in Tarrant County, TX, operated by CenterSquare (formerly Cyxtera). DataCentersExposed has documented a 309,104 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkThe Cyxtera Dallas-Fort Worth Data Center is an operating colocation facility in Tarrant County, Texas, run by CenterSquare, the operator formerly known as Cyxtera. The site spans 309,104 square feet and draws power from Denton County Elec Coop, INC, within the ERCO balancing authority.
Operator chain
- Ultimate parentCenterSquare (formerly Cyxtera)
- Files asCenterSquare (formerly Cyxtera)
- This facilityCyxtera Dallas-Fort Worth Data Center
The grid behind this site, right now
source: ERCOT · gridstatus- Natural Gas43.2%
- Solar37.3%
- Coal9.7%
- Nuclear5.6%
- Wind4.1%
Real-time generation mix for the ERCOT grid this site draws from, as of Aug 17, 2026, 8:04 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Csquare files for US IPO amid AI infrastructure boomCrypto Briefing· Jun 16, 2026
- A sticky business: Csquare CEO Spencer Mullee on the colo firm's future plansData Center Dynamics· Mar 26, 2026
- Centersquare: Leading Data Centre Growth and StrategyData Centre Magazine· Oct 22, 2025
- Brookfield’s Centersquare acquires 10 data centers in North America in $1bn dealData Center Dynamics· Oct 3, 2025
- Digital Realty acquires data center in Slough, UKData Center Dynamics· Jul 10, 2024
- Georgia Power increases power capacity by 1.4GW with fossil fuels to meet data center demandData Center Dynamics· Apr 17, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Arbor Creek El in Euless, is 2.2 mi from this site (816 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.