Skip to content
DataCentersExposed
County data-center profile

Dallas County, Texas

DataCentersExposed tracks 26 AI data centers in Dallas County, Texas — 12 operating and 5 in the pipeline, drawing 2.9 GW of reported power demand, led by Digital Realty Trust, Inc.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
26
Operating
12
Pipeline
5

Reporting by · Updated May 29, 2026

Risk breakdown
20Low
  • Project exposure · 34
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Dallas County

Facilities here with disclosed capacity draw 2.9 GW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Digital Realty Trust, Inc. has the largest presence in Dallas County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 13 standardized 36 MW campuses in Dallas County by 2035 — roughly 468 MW of new electricity demand and ~453 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 30 campuses (1.1 GW). For scale, we currently track 26 real data centers in Dallas County (2.9 GW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth11
    396 MW · ~383 M gal/yr cooling water
  • Moderate growth13
    468 MW · ~453 M gal/yr cooling water
  • High growth15
    540 MW · ~522 M gal/yr cooling water
  • Higher growth30
    1.1 GW · ~1.0 billion gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Dallas County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

26 facilities

Every tracked facility

FacilityOperatorStatusMW
Project Oranger (WHL Dallas 45 LLC)
Lancaster
Proposed252
Stemmons Corridor data campus
Dallas
CleanArcProposed70
Project Labrador (WHL Dallas 45 LLC)
Lancaster
Proposed
PowerHouse/Provident Grand Prairie
Grand Prairie
PowerHouse Data CentersUnder construction1,800
Digital Realty Garland
Garland
Digital Realty Trust, Inc.Under construction160
PowerCampus Dallas by Lancaster Data Center Campus LP
Lancaster
Operating300
QTS Irving - Dallas Data Center Campus
Irving
QTS Realty Trust, LLCOperating147
Digital Realty Dallas DFW17
Richardson
Digital Realty Trust, Inc.Mapped (unverified)100
Richardson Data Center
Richardson
Operating24
Prime DFW01-01
Dallas
Mapped (unverified)12
TierPoint Dallas Data Center
Dallas
TierPoint, LLCOperating11.1
DataBank Dallas Empire Central Data Center
Dallas
DataBank Holdings, Ltd.Operating4
Equinix N Stemmons Freeway Dallas
DALLAS
Equinix, Inc.Operating3
CoreSpace Dallas
Dallas
Mapped (unverified)
DataBank
Dallas
DataBank Holdings, Ltd.Operating
Digital Realty DFW36
Dallas
Digital Realty Trust, Inc.Mapped (unverified)
Flexential Dallas - Downtown Dallas
Dallas
Flexential Corp.Operating
Kyndryl Dallas Data Center
Dallas
Operating
Live Oak Data Center
Dallas
Mapped (unverified)
Lumen Dallas - 3180 Irving Blvd.
Dallas
Lumen Technologies, Inc.Operating
Lumen Dallas 6Lumen Technologies, Inc.Mapped (unverified)
QTS Wilmer (DFW2 and DC1)
Lancaster
Operating
Rackspace Richardson DFW3
Richardson
Rackspace Technology, Inc.Mapped (unverified)
Rad Web Hosting
Dallas
Mapped (unverified)
Stream Data CentersPrime Data CentersOperating
Virtbiz
Dallas
Mapped (unverified)
Accountability

County commissioners

How the Dallas County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.