DataBank Dallas Empire Central Data Center

1100 Empire Central Place · Dallas, Dallas County, TX

Source: OpenStreetMap

DataBank Dallas Empire Central Data Center is an operating data center in Dallas County, TX, operated by DataBank Holdings, Ltd.. DataCentersExposed has documented 4 MW of reported power capacity and a 67,717 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
DataBank Holdings, Ltd.
Operator
DataBank Holdings, Ltd.
Power
4 MW
Footprint
67,717 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

DataBank Dallas Empire Central is an operating colocation data center in Dallas, Dallas County, Texas, run by DataBank Holdings, Ltd. Public records put its footprint at 67,717 square feet. Ownership above DataBank Holdings is not detailed in available records.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.7 mi
Chancellor Row · 138 kV
Transmission line
0.2 mi
138 kV line
Municipal water
Served
Dallas Water Utility

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to DataBank Holdings, Ltd. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2025 · term yr · source
Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
42
PM2.5
Good
29
O3
Good
24
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$84K
People of color
56%
Below poverty
22%
Tract population
3,437

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Uplift Williams Preparatory Middle in Dallas, is 1.0 mi from this site (538 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.