PowerCampus Dallas by Lancaster Data Center Campus LP
Lancaster, TX
Source: Primary source
PowerCampus Dallas by Lancaster Data Center Campus LP is an operating data center in TX. DataCentersExposed has documented 300 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Here's what Lancaster County municipalities are doing about data center regulationLancasterOnline· Jun 16, 2026
- Lancaster County Commissioner Ray D'Agostino joins Stacy Garrity for data center talk to share local perspectiveLancasterOnline· Jun 8, 2026
- Proposed data center at Pennhurst in Chester County would be a mistake [column]LancasterOnline· Jun 6, 2026
- Columbia residents oppose $6.35M McGinness property sale over data center concernsLancasterOnline· May 27, 2026
- Columbia Borough rejects $6.35 million bid for McGinness Innovation ParkLancasterOnline· May 27, 2026
- Plans for a massive AI data center in Limerick Township have led to heightened security measuresWGAL· May 8, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, L Isd J J A E P in Lancaster, is 1.8 mi from this site (3 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.