Equinix N Stemmons Freeway Dallas
1950 N STEMMONS FWY STE 1034 · DALLAS, Dallas County, TX
Source: Primary source
Equinix N Stemmons Freeway Dallas is an operating data center in Dallas County, TX, operated by Equinix, Inc.. DataCentersExposed has documented 3 MW of reported power capacity, a 239,835 sq ft footprint and 1 tracked EPA enforcement record at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkEquinix N Stemmons Freeway is an operating data center in Dallas, Dallas County, Texas, run by Equinix, Inc. The site covers a reported 239,835 square feet. State records list 1 tracked environmental enforcement record tied to the facility.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix N Stemmons Freeway Dallas
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- United States: Texas Governor Abbott Announces Microsoft, Hut 8 And Equinix Commit To Comply With His Data Center Standards - The St Kitts Nevis ObserverThe St Kitts Nevis Observer· Aug 14, 2026
- Equinix Welcomes Governor Abbott's Standards for Responsible Data Center Growth in Texas - Equinix NewsroomEquinix Newsroom· Aug 11, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 75 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHO- Clean Air Actno penaltyformal · reported 2023-12-12
Environmental permits
source: Permit register- Clean Air Act permitted sourceTX0000004811301000NAICS 517910 518210; ECHO compliance status: No Violation Identified
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Esperanza Medrano El in Dallas, is 0.7 mi from this site (324 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.