Mapped (unverified)colocation
Tornado Datacenter - FRA01
Langen, Hessen, Germany
Source: Primary source
Tornado Datacenter - FRA01 is a mapped data center in Hessen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Overview
source: linkTornado Datacenter GmbH & Co. KG — colocation facility (24 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Strategische Metalle: Rothschild & Co sieht Beginn eines neuen langen Rohstoffzyklus | Investments | Aktuellinvestrends.ch· Jun 17, 2026
- Mehr Bandbreite für KI-Rechenzentren: Corning RocketRibbon-Kabel im DetailAD HOC NEWS· Jun 16, 2026
- Vom Rechenzentrum bis 5G-Basisstation: Warum Nanya Technologys DDR4 Server DRAM weiterhin gefragt blAD HOC NEWS· Jun 15, 2026
- Mit neuer Eisbar und viel Enthusiasmus: Langer Stall im Potsdamer Kreativquartier eröffnetTagesspiegel· May 21, 2026
- Potsdams Langer Stall wird eröffnet Diese elf Kreativen sollten Sie kennen – oder kennenlernenTagesspiegel· May 14, 2026
- „Mein Herz ist hier“ 23 Kreative verabschiedeten sich von Potsdams Rechenzentrum – dann kam die neue GnadenfristTagesspiegel· Apr 23, 2026
See something wrong or missing on this page? Suggest a correction.