Mapped (unverified)
Artec data center, Hessen, Germany
Hessen, Germany
Source: OpenStreetMap
Artec data center in Hessen, Germany is a mapped facility, operated by Artec. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Artec
Operator
Artec
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Overview
source: linkArtec is a mapped data center in Germany operated by Artec. Available records describe it only as an Artec data center, with no parent company disclosed. Its capacity, footprint, and operational status remain unspecified in the facts on hand.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.