Mapped (unverified)colocation
3U Rechenzentrum Marburg
Marburg, Hessen, Germany
Source: Primary source
3U Rechenzentrum Marburg is a mapped data center in Hessen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Overview
source: link3U TELECOM GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Biontech schließt Standorte Schock in Marburg - alle 540 Jobs wegHit Radio FFH· May 5, 2026
- Ugandas Python-Höhle: Ein Blick ins Reservoir des Marburg-VirusEuronews· Apr 23, 2026
- Den Wahlhelfern in Biedenkopf beim Zählen über die Schulter geblicktMittelhessen· Mar 17, 2026
- Kürzungen: Wie die hessischen Unis sparenForschung & Lehre· Mar 2, 2026
- Marburg: Innenstadt-Halt wäre ohne großen Aufwand möglichFAZ· Feb 4, 2026
- Sparzwang wegen neuem Hochschulpakt: Uni Darmstadt schließt zwei InstituteFrankfurter Rundschau· Dec 19, 2025
See something wrong or missing on this page? Suggest a correction.