Yondr - Rechenzentrum
Bischofsheim, Hessen, Germany
Source: OpenStreetMap
Yondr - Rechenzentrum is a mapped data center in Hessen, Germany, operated by Yondr. DataCentersExposed has documented 40 MW of reported power capacity and a 188,016 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkYondr operates this mapped data center in Bischofsheim, in Germany's Hesse region. The site carries a reported power capacity of 40 MW across a footprint of 188,016 square feet, described in existing records simply as a 40MW Data Center. Public details on the project's ultimate corporate ownership are not confirmed in the verified record.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Bebauungsplan für Rechenzentrum FRA41 in Raunheim angepasstEcho Online· Jan 6, 2026
- Große Stromfresser - was bringen Rechenzentren der Region Frankfurt/Rhein-Main?Echo Online· Jan 4, 2026
- Bischofsheim erstellt kommunale WärmeplanungEcho Online· Sep 24, 2025
- Yondr nimmt 20-Megawatt-Rechenzentrum bei Frankfurt in BetriebDataCenter-Insider· Jul 15, 2025
- Arbeiten am Bischofsheimer Rechenzentrum schreiten voranEcho Online· Sep 11, 2024
- Großes Potenzial und offene Fragen beim neuen RechenzentrumEcho Online· Jun 18, 2024