Lumen Austin 1
4209 Smith School Road · Travis County, TX
Source: OpenStreetMap
Lumen Austin 1 is a mapped data center in Travis County, TX, operated by Lumen Technologies, Inc.. DataCentersExposed has documented a 74,722 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Take action
Travis, Texas
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Hearing timeline
- City Council
Thu, Aug 27, 2026 · 10:00 AM CDT
City Council: data-center item — Approve a resolution initiating amendments to City Code Title 25 (Land Development Code) and other provisions of City Code or regulations necessary to establish land uses, site development regulations, and development processes, for data center use in certain zoning
- City Council Work Session
Tue, Aug 25, 2026 · 9:00 AM CDT
City Council Work Session: Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Austin Water, Stuart Reilly, General Manager - Austin Energy].
Never miss a meeting: subscribe in your calendar · download .ics
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkdata center
Operator chain
- Ultimate parentLumen Technologies, Inc.
- Files asLumen Technologies, Inc.
- This facilityLumen Austin 1
The grid behind this site, right now
source: ERCOT · gridstatus- Natural Gas43.2%
- Solar37.3%
- Coal9.7%
- Nuclear5.6%
- Wind4.1%
Real-time generation mix for the ERCOT grid this site draws from, as of Aug 17, 2026, 8:04 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- New York Yankees Select Lumen Technologies for Stadium and Data Center ConnectivitySports Video Group· Jul 22, 2026
- Lumen lights up network upgrades for Yankees StadiumData Center Dynamics· Jul 16, 2026
- Lumen connects Yankee Stadium with new Tampa data centreTelecompaper· Jul 15, 2026
- New York Yankees Choose Lumen to Power Game-Day Connectivity, Data Resilience, and the Fan ExperienceLumen - Investor Relations· Jul 14, 2026
- New York Yankees tap Lumen Technologies to power Tampa data center expansionThe Business Journals· Jul 14, 2026
- Lumen guts channel staff in AI and data center pivot: reportSDxCentral· Jul 10, 2026
In public meetings
Where this facility is discussed in the verbatim record of public government meetings. Captions are auto-generated and uncorrected.
- City Council Work SessionAug 25, 2026
“…tem that is also on the regular meeting agenda. 2. Pre-Selected Agenda Items 3. Briefings 4. [26-2407] Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Aust…”
Read the transcript · 4 mentions
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Austin), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Smith El in Austin, is 339 ft from this site (508 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.