Under construction

Skybox - Austin 2

Pflugerville, Travis County, TX

Source: Primary source

Skybox - Austin 2 is a under construction data center in Travis County, TX.

Reporting by · Updated Jun 23, 2026

Campaign · Decision pending

Take action

Travis, Texas

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Hearing timeline

  1. City Council

    Thu, Aug 27, 2026 · 10:00 AM CDT

    City Council: data-center item — Approve a resolution initiating amendments to City Code Title 25 (Land Development Code) and other provisions of City Code or regulations necessary to establish land uses, site development regulations, and development processes, for data center use in certain zoning

    AgendaMeeting detailsvia Legistar · medium confidence
  2. City Council Work Session

    Tue, Aug 25, 2026 · 9:00 AM CDT

    City Council Work Session: Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Austin Water, Stuart Reilly, General Manager - Austin Energy].

Never miss a meeting: subscribe in your calendar · download .ics

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Operator
Interconnection
~75 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Announced investment: $0.09. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.2 mi
Unknown305920
Transmission line
0.3 mi
138 kV line
Municipal water
Served
City Of Pflugerville

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In public meetings

Where this facility is discussed in the verbatim record of public government meetings. Captions are auto-generated and uncorrected.

  • City Council Work SessionAug 25, 2026

    “…tem that is also on the regular meeting agenda. 2. Pre-Selected Agenda Items 3. Briefings 4. [26-2407] Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Aust…”

    Read the transcript · 4 mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Highland Park El in Pflugerville, is 0.7 mi from this site (686 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.