CyrusOne Austin Data Center III is an operating data center in Travis County, TX, operated by CyrusOne LLC. DataCentersExposed has documented 24 MW of reported power capacity and a 189,921 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Campaign · Operating

Take action

Travis, Texas

0
supporters

It's built. The levers now are permit renewals, noise/air complaints, and rate-case intervention.

Hearing timeline

  1. City Council

    Thu, Aug 27, 2026 · 10:00 AM CDT

    City Council: data-center item — Approve a resolution initiating amendments to City Code Title 25 (Land Development Code) and other provisions of City Code or regulations necessary to establish land uses, site development regulations, and development processes, for data center use in certain zoning

    AgendaMeeting detailsvia Legistar · medium confidence
  2. City Council Work Session

    Tue, Aug 25, 2026 · 9:00 AM CDT

    City Council Work Session: Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Austin Water, Stuart Reilly, General Manager - Austin Energy].

Never miss a meeting: subscribe in your calendar · download .ics

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

24 MW of new demand — roughly a city of 19,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in TX is 16.4¢/kWh, up 5.9% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
CyrusOne LLC
Operator
CyrusOne LLC
Power
24 MW
Footprint
189,921 sq ft
Interconnection
~17 MW
Utility
Austin Energy
Grid
ERCO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

data center

Operator chain

The grid behind this site, right now

source: ERCOT · gridstatus
Clean right now
47%
Fossil right now
53%
Grid operator
ERCOT
  • Natural Gas43.2%
  • Solar37.3%
  • Coal9.7%
  • Nuclear5.6%
  • Wind4.1%

Real-time generation mix for the ERCOT grid this site draws from, as of Aug 17, 2026, 8:04 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.6 mi
Met Center · 138 kV
Transmission line
309 ft
138 kV line
Municipal water
Served
City Of Austin Water & Wastewater

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

In public meetings

Where this facility is discussed in the verbatim record of public government meetings. Captions are auto-generated and uncorrected.

  • City Council Work SessionAug 25, 2026

    “…tem that is also on the regular meeting agenda. 2. Pre-Selected Agenda Items 3. Briefings 4. [26-2407] Briefing on the current status of data center uses in the City and possible future amendments to the City Code or regulations. [Joi Harden, Acting Assistant Director - Austin Planning, Shay Roalson, Director - Aust…”

    Read the transcript · 4 mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to CyrusOne LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2017 · term yr · source
  • Texas Qualifying Data Center ExemptionTax break$0
    State of Texas · granted 2016 · term yr · source
Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

Modeled estimate~319.3K gpd
Direct (onsite cooling)
~172.5K gpd
Indirect (its electricity)
~146.9K gpd

No measured record exists, so this is a low-confidence model from 17 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
54
PM2.5
Moderate
24
O3
Good
21
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Austin), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$111.5K
People of color
81%
Below poverty
5%
Tract population
8,769

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, The Excel Center For Adults - South Austin in Austin, is 0.8 mi from this site (96 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.