Skip to content
DataCentersExposed
Mapped (unverified)

Equinix ML7x

Settimo Milanese, Lombardia, Italy

Source: OpenStreetMap

Equinix ML7x is a mapped data center in Lombardia, Italy, operated by Equinix, Inc.. DataCentersExposed has documented a 44,838 sq ft footprint at this site. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Est. capacity
~5-20 MW
Footprint
44,838 sq ft
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lombardia
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Equinix ML7x is a mapped data center in Settimo Milanese, Italy, run by Equinix, Inc. Available records put its footprint at 44,838 square feet. Beyond its identification as an Equinix data center, further details about the site are not disclosed in available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh

A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Italy data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.