Avalon 2

Settimo Milanese, Lombardia, Italy

Source: OpenStreetMap

Avalon 2 is a mapped data center in Lombardia, Italy, operated by Irideos. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Irideos
Operator
Irideos
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lombardia
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Avalon 2 is a data center in Settimo Milanese, Italy, operated by Irideos. Available records identify the site only as an Irideos data center, currently mapped rather than confirmed in further detail. No ultimate parent, capacity, or footprint figures appear in the available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh

A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Italy data centers.