Equinix JH1 - Johor is a mapped data center in Johor, Malaysia, operated by Equinix, Inc.. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Johor
Overview
source: linkEquinix, Inc. — colocation facility (13 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix JH1 - Johor
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- Malaysia's resource anxiety tests Asia's fastest data centre build-outReuters· Jul 26, 2026
- Data center project in Johor, Malaysia, shut down for breaching building regulationsData Center Dynamics· Aug 22, 2025
- Malaysia’s UEM Sunrise and Crescendo Corp sell land in Johor, Singtel rumored to come to cityData Center Dynamics· Jun 13, 2024
- Equinix continues expansion plan, unveils new data centreThe Malaysian Reserve· Jun 12, 2024
- GDS Builds Malaysia Data Center to Access SingaporeDgtl Infra· Jul 15, 2021
See something wrong or missing on this page? Suggest a correction.