Mapped (unverified)colocation
Open DC JB1 - Menara MSC Cyberport
Johor Bahru, Johor, Malaysia
Source: Primary source
Open DC JB1 - Menara MSC Cyberport is a mapped data center in Johor, Malaysia. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Johor
Overview
source: linkOPEN DC SDN BHD — colocation facility (16 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- Johor leads Apac data centre boom as Malaysia tops construction — C&WEdgeProp· Aug 27, 2026
- Southeast Asia data centre investment to hit $35bn by 2031The Next Web· Aug 25, 2026
- Malaysia Data Center Growth Surges as Johor Capacity TightensTechRepublic· Aug 24, 2026
- State-owned real estate group looking to develop data center in Johor, MalaysiaData Center Dynamics· Aug 20, 2026
- STT GDC secures US$1.37 billion green financing for Johor data centre campus as Temasek-backed firm bets on Iskandar PuteriThe Independent Singapore News· Aug 17, 2026
- Malaysia's HE Group Snags RM47 Million Letter of Intent for Johor Data Center Projectfinance.biggo.com· Aug 11, 2026