TM ONE IPDC, Johore
Iskandar Puteri, Johor, Malaysia
Source: Primary source
TM ONE IPDC, Johore is a mapped data center in Johor, Malaysia. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Johor
Overview
source: linkTelekom Malaysia Berhad (TM) — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- STT GDC secures US$1.37 billion green financing for Johor data centre campus as Temasek-backed firm bets on Iskandar PuteriThe Independent Singapore News· Aug 17, 2026
- Malaysia's resource anxiety tests Asia's fastest data centre build-outReuters· Jul 26, 2026
- Malaysian property group Paragon Globe agrees to sell 65-acre Johor land parcel to data center firm DayOneData Center Dynamics· Jun 24, 2026
- Singtel's Nxera and Telekom Malaysia top out data center in JohorData Center Dynamics· Apr 13, 2026
- ‘Lesson’ for Malaysia’s Johor: Data centres should not be too near homes, says assemblyman after outcryAsia News Network· Mar 12, 2026
- TM Nxera Secures 280 MW Power Supply for AI-Ready Data Center Campus in JohorTelecom Review Asia· Jan 15, 2026