Equinix Infomart
1950 North Stemmons Freeway · Dallas, Dallas County, TX
Source: OpenStreetMap
Equinix Infomart is an operating data center in Dallas County, TX, operated by Equinix, Inc.. DataCentersExposed has documented a 239,835 sq ft footprint at this site.
Reporting by Eric Keller · Updated Aug 27, 2026
Overview
source: linkEquinix Infomart is an operating colocation data center in Dallas, Dallas County, Texas, run by Equinix, Inc. Public records put its footprint at 239,835 square feet. Available filings do not name a corporate parent above Equinix for this site.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix Infomart
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- United States: Texas Governor Abbott Announces Microsoft, Hut 8 And Equinix Commit To Comply With His Data Center Standards - The St Kitts Nevis ObserverThe St Kitts Nevis Observer· Aug 14, 2026
- Equinix Welcomes Governor Abbott's Standards for Responsible Data Center Growth in Texas - Equinix NewsroomEquinix Newsroom· Aug 11, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Esperanza Medrano El in Dallas, is 0.7 mi from this site (324 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.